01
03
02
16
16
CHAPTER
SAFETY / RESIDUAL RISKS
EQUIPMENT’S TRANSPORT, UNPACKING AND SETTING UP
-
6JGVTCPURQTVOWUVDGECTTKGFQWVQPN[YKVJUWHſEKGPVRGTUQPPGNCEEQTFKPIVQVJGPCVKQPCN
industrial safety regulations.
- A forklift or a lift tray truck are recommended for the transport of the pallet (weight approx.
200 kg). Caution when lifting!
- The Zirkonofen 600/V3 sintering furnace has to be moved and put down on surfaces with
suitable stability, in a dry place and in a non-corrosive environment.
- Stable, non-slip installation surface, which can bear a minimum weight of 200 kg.
-
CAUTION:
Remove the packaging material at the inside of the combustion chamber.
- Caution when removing the cardboard casing.
- Caution when unpacking and setting up the sintering furnace: risk of injury.
- Power supply must be installed and attached by an expert.
- The device must not be connected to the electric circuit during the installation phase:
danger of electric shock.
- The original packaging has to be kept for at least 1 year.
SAFETY PROCEDURES AT THE SITE OF THE INSTALLATION
- Stable, non-slip installation surface, which can bear a minimum weight of 200 kg.
- Safety distance of min. 2 m to combustible material.
- Safety distance of min. 2 m to water.
- Minimum distance of min. 1.5 m to all sides (for cooling air, access).
-
0QQDLGEVUCTGVQDGRNCEGFQPVQRQHQTDGUKFGVJG<KTMQPQHGP8UKPVGTKPIHWTPCEGſTGJC\CTF
DISPATCH AND FREIGHT COSTS
Unless otherwise agreed in writing, the buyer is responsible for dispatch, freight and possible
import fees.
Check the delivery for completeness and integrity immediately after receipt. Evident defects must
be noted on the delivery notes, in order to claim for compensation against the carrier company.
Summary of Contents for zirkonofen 600/V3
Page 1: ...zirkonofen 6oo V3 operator s and maintenance manual...
Page 3: ...03 03...
Page 7: ...07 07...
Page 10: ...10 10...
Page 18: ...18 18 CHAPTER SAFETY RESIDUAL RISKS...
Page 19: ...19 19 CHAPTER 2 COMPONENTS COMPONENTS...
Page 22: ...22 22 CHAPTER 3 TECHNICAL DATA...
Page 28: ...28 28 CHAPTER 5 OPERATION...
Page 30: ...30 30 CHAPTER 6 SINTERING PROGRAMMES...
Page 39: ...39 39...