Oxygen Monitor SGM7.2.4/7.2.6 7 Installation
21
7
Installation and initiation
7.1
Installation conditions
The protective gas monitor must be set up in a dry and mainly dust-free
place on a stable, flat surface.
•
A socket, preferably as a separate electrical circuit, must be
available in immediate proximity of the installation place, protected
with a 10 A fuse.
•
No heat sources or appliances, which produce strong magnetic
fields (e.g. electric motors, transformers), should be put in the
proximity of the installation place.
•
The SGM7.2.4 operates in horizontal position.
A vertical placement may cause damage by heat accumulation and is not
permitted.
A liquid entry can lead to severe damage or to the complete
destruction of the device.
7.2
Set-up of operating state
A temperature compensation is required after the transportation of the
SGM7.2.4 from cold surroundings to a site with higher ambient
temperature or humidity
.
A
waiting time of about 2 hours
before
switching-on must be considered.
1. Install the SGM7.2.4 in the favored place (see chapter 7.1).
2. Connect point of measurement and places of gas inlet and outlet of
the SGM7.2.4. Pay attention to leak-tightness.
3. If a pressure limit is required, install a needle valve directly in front of
the gas inlet (available from manufacturer of the SGM7.2.4).
4. If the amount of water vapor in the measuring gas is likely to cause a
condensation of water in a cold gas pipe, a water trap must be installed
in front of the gas inlet. (The penetration of water into the hot
measuring cell can destroy it and therefore must be absolutely
prevented.)
5. Connect the SGM7.2.4 to the power supply.
NOTE
NOTE