BGM1000 Series Barrier Gate (APP Version) User Manual
P a g e
| 27
Copyright©2023 ZKTECO CO., LTD. All rights reserved.
Direction Interchange of the Boom Arm
9.3
The operation steps are as follows:
1.
Before operation, please turn off the power. Remove the spring, spring hanging arm
and boom.
2.
Change the direction of the Spindle Connecting Arm and linkage Arm.
3.
Turn the Limited Block to the other direction.
4.
After the mechanical operation, you need to set the movement parameter 13E Core
Component Position on the motherboard, such as changing from L to R, the value of
this parameter should be set from 1 to 0, or set the direction of the movement on the
app.