CMP-200 User Manual
P a g e
| 19
Copyright©2020 ZKTECO CO., LTD. All rights reserved.
8
Commissioning Instructions
1.
Check all the connections and make sure the connections are correct
before connecting the power.
2.
Please use the remote control or press the switch button on the
mainboard to test whether the machine is running normally.
3.
Warning: Be sure to install the corresponding length of the boom before
the power-on test. To avoid accidents, no one is allowed to stand under
the boom during testing.
4.
In the process of boom falling, short connect the infrared detector and
public interface, so that the falling boom will start rising immediately, and
will stop automatically after the rising limit. This is mimic the effect of
infrared detectors.
5.
In the process of boom falling, short connect the loop detector and public
interface, the falling boom is transferred to rising immediately, which will
fall automatically after the rising limit and stop automatically after the
falling limit. In the process of boom rising, short connect the loop
detector and public interface, the boom will fall automatically after the
rising limit and stop automatically after the falling limit. In the open state,
short connect the loop detector and public interface; the boom will
automatically fall to the limit and stop. This imitates the effect of the loop
detector.