 FBL6000 Pro series User Manual 

 

3.

 

Electric and Civil Installation 

1.   Device installation conditions 

The location where the device is installed must be a concrete flat surface so that the expansion screws 

can be fastened firmly. If the planned foundation does not meet this criterion, consult professional 

building or decoration personnel and create stable conditions for firmly fastening of the wing gate. 

2.   Determination of the location of device installation 

Decide the installation location based on the space needed as illustrated in Figure 3-1A and Figure 3-

1B. 

 

 

Figure 3-1A Single-Passage Wing Gate                             Figure 3-1B Dual-Passage Wing Gate 

3.    Cable connection 

For the location of the hole where the cables come out, please refer to Figure 3-2 below. 

4.    Device installation 

a)

 

Turn  on the master machine and slave machine, adjust the wing arms to ensure that the wing 

arms are in the same line and the distance between wings is 50 mm. Turn the wings to the OFF 

state.  

b)

 

Test whether the infrared rays transmitted by infrared sensors on both sides align with each other.  

c)

 

Make marks: Mark the screw hole of the base and chassis base edges on the ground.  

Summary of Contents for FBL1000 Pro Series

Page 1: ...Series Applicable Model s FBL1000 Pro series FBL1200 Pro series FBL2000 Pro series FBL2200 Pro series FBL4000 Pro series FBL4200 Pro series FBL5000 Pro series FBL5200 Pro series FBL6000 Pro series FB...

Page 2: ...Dimensions 1 1 2 Technical Parameters 2 1 3 Model Number and Access Control 2 2 Power on Test Prior to Installation 3 3 Electric and Civil Installation 4 4 Menu Operation 7 5 Wiring Diagram 9 6 Produc...

Page 3: ...ol linkage interfaces The entire system complies with the same quality standard to ensure reliability stability and smoothness of the system during running The wing gate is applicable to work attendan...

Page 4: ...Time of opening closing 1 second adjustable Relative humidity 5 80 Temperature 28 to 60 Passage rate Maximum 30 minute Infrared sensor 5 Working environment Indoor 1 3 The model number and access cont...

Page 5: ...ce Note that a ground cable must be connected 2 Wait 30 seconds till the wing gate completes the self test procedure 3 Start the air switch inside the wing gate to check whether the wing gate function...

Page 6: ...installation location based on the space needed as illustrated in Figure 3 1A and Figure 3 1B Figure 3 1A Single Passage Wing Gate Figure 3 1B Dual Passage Wing Gate 3 Cable connection For the locati...

Page 7: ...re 3 2 for installation hole positions The unit of the figures in the drawings is mm Figure 3 2 e Apply screw glue to the outer surface and threads of the expansion screws insert expansion screws and...

Page 8: ...L6000 Pro series User Manual Figure 3 3 5 Card Swiping Warning Lines It is recommended that a warning line is set to prompt users to swipe cards outside the warning lines as shown in Figure 3 4 Figure...

Page 9: ...pe Left swipe Right prohibit Left prohibit Right free Left free Right prohibit Two way prohibit 2 Opening speed Low speed Medium speed default High speed 3 Closing speed Low speed Medium speed default...

Page 10: ...d audio alarm Audio alarm only default Disable the alarm function 11 Set fire signal Enable default Disable 12 Exchange voice of door opening Yes No default 13 Speed compensation of master machine Com...

Page 11: ...FBL6000 Pro series User Manual 9 18 Version number Version V7 0 3 5 Wiring Diagram Below is the wiring diagram Figure 5 1...

Page 12: ...lubricate the transmission mechanism Check and tighten other connection parts 6 3 Power Cut off the power supply before maintenance Check the plug connection if anything is loose fix it Do not randoml...

Page 13: ...Copyright 2019 ZKTECO CO LTD All rights reserved ZK Building Wuhe Road Gangtou Bantian Buji Town Longgang District Shenzhen China 518129 Tel 86 755 89602345 Fax 86 755 89602394 www zkteco com...

Reviews: