Warning:
1.
The depth of the buried PVC line pipe should be greater than 60mm, the height of the exposed
ground should be greater than 50mm, and the outlet should be bent back to prevent the line pipe
from entering the water.
2.
When installing channel gates, the left and right gates of each channel should be aligned.
3.
Connect the system protection ground wire.
4.
If the equipment is used outdoors, a cement platform with a height of 100 to 200mm should be
built at the equipment installation place to prevent moisture, and a roof and other sun-proof and
rain-proof facilities should be added.
5.
After the equipment is installed, it can be put into normal use only after the state inspection and
function debugging are qualified.
Equipment Function Debugging
4.2
All function debugging can be carried out after the equipment status is checked normally!
Preparation before commissioning
Check the mains wiring according to the wiring diagram. Check that the power wiring and other wiring of
the entire device are correct. Power on and debug after confirmation! The protective ground of the
equipment must be grounded reliably, otherwise it is not allowed to use it.
Instructions for parameter setting of gate
After the control board is powered on, the LCD screen displays the default state, which displays the
"working model" of the control board at this time (swing gate, side-opening swing gate, and swing gate),
as well as parameters such as the number of passes through the entrance and exit.
There are 5 operation buttons on the control panel, "Menu", "Up", "Down", "OK" and "Cancel"
。
Key Description
Menu:
Used to enter the menu setting items
Up:
Used to move menu items up
Down:
Used to move menu items down
OK:
Used to enter the menu item setting item or confirm the current modified value
Cancel:
Used to return to the previous menu or cancel the current operation