2 FBL6000 Pro series installation guide
2 Power-on Test Prior to Installation
Test Procedure:
1.
Connect a temporary test cable to the device and supply the input power of AC100-240V
adaptive to the device (Note that a ground cable must be connected.)
2.
Wait 30 seconds till the wing gate completes the self-test procedure.
3.
Start the air switch inside the wing gate to check whether the wing gate functions properly and
check whether the LED indicators function properly. If they all function properly, start the civil
installation. If an exception occurs, contact your sales agent.
Figure 2-1 Air Switch