4 FBL6000 Pro series installation guide
c) Make marks: Mark the screw hole of the base and chassis base edges on the ground.
d) Drill holes: Get ready a hammer drill and a 14 mm drill bit, vertically drill a hole with the depth of
80 mm in the screw hole centre marks.
Alternatively, drill holes according to installation hole positions, see Figure 3-2 for installation hole
positions. The unit of the figures in the drawings is mm.
Figure 3-2
e) Apply screw glue to the outer surface and threads of the expansion screws, insert expansion
screws, and put the master machine and slave machine in the marked positions. Use a level to
check whether the installation ground foundation is level. If not, use a pad for adjustment.
Note:
Eight expansion screws must be completely inserted, as shown in Figure 3-3.