background image

It  is  recommended  that  the  device  must  be  installed  on  a  horizontal  solid  platform  with  a  height  of  
50mm to 100mm.

1.

After  installation,  check  if  the  connection  has  been  done  correctly  at  the  connecting  points  of  the 
ground wire, at the connector assemblies and wiring points of the circuits, as well as at each movable 
part of the device. Any loose nuts, screws and other fasteners should be tightened in time to avoid any 
failures caused by long-time operations. 

4.

1

1  Installation Requirements 

3.

Make  sure  the  ground  wire  of  the  system  is  reliably  connected  to  avoid  personal  injuries  or  other 
accidents.

2.

It

 

is

 

also

 

recommended

 

that

 

the

 

device

 

should

 

not

 

be

 

used

 

in

 

the

 

corrosive

 

environment

.

2  Preparation

To install the device you must have:

A Screwdriver:

 To remove or install the screw on the device. 

A Pencil: 

To mark the device  size and the screw hole. 

A Electric Drill:

 To drill holes in accordance to the marked screw holes. 

A Wrench:

 To secure the M12 expansion screw on the device.

A Tapeline:

 To measure the dimensions that need to be measured during the installation of the device.

A Hex Wrench: 

To remove or install the screw on the device. 

Except for the hex wrench, all other tools should be prepared on your own.

Note:

 

The FHT2300 series, FHT2300D series, FHT2400 series and FHT2400D series have only slight differences 
in  appearance,  but  the  installation,  wiring  and  use  are  the  same,  and  the  following  is  an  example  of 
FHT2300 series.

Summary of Contents for FHT 2300D

Page 1: ...ts ZKTeco could not guarantee exact consistency between the actual product and the written information in this manual Full Height Turnstile Series Applicable Models FHT2300 Series FHT2300D Series FHT2400 Series FHT2400D Series Doc Version 1 1 Date July 2022 English ...

Page 2: ...o recommended that the device should not be used in the corrosive environment 2 Preparation To install the device you must have A Screwdriver To remove or install the screw on the device A Pencil To mark the device size and the screw hole A Electric Drill To drill holes in accordance to the marked screw holes A Wrench To secure the M12 expansion screw on the device ATapeline To measure the dimensi...

Page 3: ...2 3 Installation Place the frame to the installation site and mark the floor following the periphery of the legs 1 ...

Page 4: ...here may be errors please refer to the actual product FHT2300 Series FHT2300D Series 92 00 142 00 92 00 146 00 70 00 182 00 274 64 410 29 575 00 596 44 1242 89 594 44 576 44 92 00 92 00 92 00 146 00 146 00 142 00 92 00 274 64 416 40 197 50 155 00 197 50 416 40 274 64 142 00 97 44 596 44 594 44 1237 44 1242 89 3 ...

Page 5: ...00 Series 8 00 47 63 682 39 146 00 164 00 146 00 682 39 8 02 47 63 91 65 142 00 91 65 66 07 565 07 1180 49 1206 07 FHT2400D Series 629 31 575 00 70 00 91 65 564 37 562 37 142 00 91 65 1179 10 146 00 47 60 4 ...

Page 6: ...ds to the mark on the device 4 User must pull the power cable and Ethernet from the machines and put them into the wire slot φ25mm PVC pipe Tether Cable Power Cable Ethernet 5 The input voltage for this full height turnstile is AC100 120V 200 240V The PVC conduits are buried 100mm below the ground with the height of the exposed part not less than 100mm To prevent water leakage to the conduit the c...

Page 7: ...holes Then insert the bolts accordingly and fix them with a wrench Finally insert the washer and nut tighten it with a wrench 6 Put the mainframe box on the frame after connect the power cable Ethernet and Tether Cable fix up with M12 screws ...

Page 8: ...y attention to the details in green circle both of them should be in vertical direction The rotor direction should be place like this Planview of rotor of three arm barrier 120 position and direction before installation 7 ...

Page 9: ...8 7 Put the whole rotating part in the middle of the frame and mainframe box and then fix up with screws and connection block ...

Page 10: ...9 Bottom Top Front ...

Page 11: ... 4 Wiring Diagram After fixing the device open the mainframe box to connect power wire and reader Pull out the reader and power cord from both sides of the column and connect to the corresponding interface ...

Page 12: ...ZKTeco Industrial Park No 32 Industrial Road Tangxia Town Dongguan China Phone 86 769 82109991 Fax 86 755 89602394 www zkteco com Copyright 2022 ZKTECO CO LTD All Rights Reserved ...

Reviews: