background image

 

 

 

1.5 The working principle of full height turnstiles 

1.5.1 After the power is turned on, the system will perform self-check. If no fault is detected, the 

device will operate as usual. If a fault is detected, the system will display the related messages on 

the LCD screen. This can be useful for error checking and troubleshooting. 

 

1.5.2 When the reader detects a valid signal, the buzzer will give pedestrians a voice prompts to 

remind pedestrians have been successful credit card.  And then, the reader sends signals to the 

access controller  to request permission to pass through the passage. After the access controller 

send the signals to the control panel, the control panel will send out a pass. 

 

1.5.3 After receiving the signal from the access controller, the control panel sends signals to the 

direction indicator and solenoid. Then the direction arrow will turn green. Also the solenoid will 

loose that the pedestrian can push the rod to pass the passage. 

 

1.6 Product related parameters 

Dimensions(mm) 

FHT2000:    L = 1400, W = 1310, H = 2200 

FHT2400:    L = 1400, W = 1370, H = 2200 

Communication 

Interface 

RS232 

Input voltage 

AC 100 - 120V/200 - 240V, 

50 - 60Hz 

Input control signal 

Switching signal 

Output 

voltage 

DC 24V 

Working  environment

 

Indoor/Outdoor

 

Relative 

humidity 

25% - 75% 

Temperature 

-28

~ 60

 

Pass speed 

RFID

Maximum 30/minute 

Fingerprint

Maximum25/minute 

Face

Maximum 15/minute 

Vein

Maximum 15/minute 

Summary of Contents for FHT2311

Page 1: ...USER MANUAL Full Height Turnstile Applicable Models FHT 2300 2400...

Page 2: ...tiles 3 1 6 Product related parameters 3 Chapter 2 The Installation of the Device 4 2 1 Installation notes 4 2 2 Installation position of the full height turnstile 4 2 3 Installation and fixation of c...

Page 3: ...wo KR101E reader InBio260 with two FR1200 ID reader FHT2300 FHT2311 FHT2322 FHT2400 FHT2411 FHT2422 1 2 Structures and dimensions FHT2000 series has stainless steel casing which provides corrosion res...

Page 4: ...re mainframe box 1 4 Electronic control system The electronic control system of the full height turnstile is composed of reader control panel access controller direction indicator horn and transformer...

Page 5: ...fter the access controller send the signals to the control panel the control panel will send out a pass 1 5 3 After receiving the signal from the access controller the control panel sends signals to t...

Page 6: ...onnector assembly for connecting line and all moving parts with the device Make sure the connection is firm in order to prevent failure caused by long time operation If any screw or part is not tighte...

Page 7: ...5 conduit the conduit mouth needs to be bent back FHT2300 FHT2400 series installation holes are as shown in Figure 2 3A and Figure 2 3B Figure2 3A Figure2 3B 25 PVC pipe 25 PVC pipe...

Page 8: ...screw and fix it After that the mainframe box is fixed on the frame Finally install the whole rotating part in the middle of the frame as shown in Figure 2 3C Figure2 3C After fixing the device open...

Page 9: ...7 Figure2 3D...

Page 10: ...Move down menu or reduce value OK Use to enter the menu item settings or to confirm the current value ESC Use to return to the previous menu or cancel the current operation 3 3 Menu operation and des...

Page 11: ...are allowed to pass Y N stand for being allowed on the right and forbidden on the left N Y stand for being forbidden on the right and allowed on the left N N stand for being forbidden on both sides Y...

Page 12: ...t 8 Device number Press UP and DOWN buttons to adjust values Press OK button to save When plural devices are placed together different device number can be used to distinguish the default number is 1...

Page 13: ...on mechanism Check and tighten others connection parts 4 3 Power maintenance Cut off power supply before maintenance Check whether the plug is loose if loose it needed to tightly it Please do not repl...

Reviews: