Installation Procedure 

 

Installation Precautions 

1.

 

Install  the  parking  barrier  on  a  flat  surface.  A  cement  foundation  is  required  before 

installation if the ground is not solid and flat. 

2.

 

It is possible to reduce the length of the boom, but it cannot be increased. After the boom 

has been cut, it is important to set the spring balance again to achieve a new balance. The 

bottom of the spring contains two plastic nuts designed to adjust the new balance. 

3.

 

When the barrier is powered on, do not change the wire connection inside. 

4.

 

Connect the GND to the cabinet to ensure protection. 

 

Tools Preparation 

Make sure you have all the tools that you will need to do the job. The following is a list of 

tools that are required: 

 

Impact Drill 

 

Adjustable Wrench 

 

Hammer 

 

Needle-nose Pliers 

 

Hexagon Wrench (Allen Key) 

 

Screwdriver, etc. 

 

 

Summary of Contents for LB330

Page 1: ...oosing our product Please read the instructions carefully before operation Follow these instructions to ensure that the product is functioning properly The images shown in this manual are for illustrative purposes only www zkteco com User Manual LB330 Parking Barrier Date June 2022 Doc Version 1 0 English ...

Page 2: ...ontent s of the manual seems unclear or incomplete please contact ZKTeco before starting the operation and maintenance of the said equipment It is an essential pre requisite for the satisfactory operation and maintenance that the operating and maintenance personnel are fully familiar with the design and that the said personnel have received thorough training in operating and maintaining the machin...

Page 3: ... delete amend or modify the information contained in the manual from time to time in the form of circulars letters notes etc for better operation and safety of the machine unit equipment The said additions or amendments are meant for improvement better operations of the machine unit equipment and such amendments shall not give any right to claim any compensation or damages under any circumstances ...

Page 4: ...d development of biometric verification procedures and the productization of biometric verification SDK which was initially widely applied in PC security and identity authentication fields With the continuous enhancement of the development and plenty of market applications the team has gradually constructed an identity authentication ecosystem and smart security ecosystem which are based on biomet...

Page 5: ...le and field names are inside square brackets For example pop up the New User window Multi level menus are separated by forwarding slashes For example File Create Folder Symbols Convention Description This implies about the notice or pays attention to in the manual The general information which helps in performing the operations faster The information which is significant Care taken to avoid dange...

Page 6: ... 12 BOOM ARM INSTALLATION 13 5 4 1 BOOM ARM INSTALLATION PROCEDURE 13 6 MAIN CONTROL BOARD INSTRUCTIONS 14 CONTROL BOARD EXTERNAL PRODUCT REQUIREMENT 14 MAIN BOARD WIRING DIAGRAM 14 MAIN CONTROL BOARD OPERATION 15 6 3 1 SELF INSPECTION LEARNING SWITCH BARRIER LIMIT METHOD 15 6 3 2 OPERATION STEPS OF THE MAIN BOARD BUTTONS 15 PARAMETER SETTINGS DESCRIPTION 16 REMOTE CONTROL PAIRING AND UNPAIRING 19...

Page 7: ...LB330 Parking Barrier User Manual P a g e 7 Copyright 2022 ZKTECO CO LTD All rights reserved 9 TRANSPORTATION AND STORAGE 21 ...

Page 8: ... controllers and is compatible with LPR cameras UHF readers and biometric devices 2 Features and Functionalities 1 The fastest operating speed is 5s the speed can be adjusted according to different boom arm lengths 2 Digital control monitoring supports delay automatic close functions 3 High safety support power off manually rise boom arm anti smash functions 4 The position of the angle of rising f...

Page 9: ...LB330 Parking Barrier User Manual P a g e 9 Copyright 2022 ZKTECO CO LTD All rights reserved 3 Appearance and Dimensions ...

Page 10: ... 5s Configurable Boom Length 2m Boom Type Round Boom with LED Light Chassis Dimensions L W H 140 110 812 mm Weight 12Kg Motor Type 24V DC Brushless Motor Output Power 40W Output Current 2A Working Voltage DC 24V Power Supply AC 220V 50Hz Operating Temperature 30 C to 60 C MCBF 1 million times Remote Control Distance 30m Operating Humidity 90 RH ...

Page 11: ...eased After the boom has been cut it is important to set the spring balance again to achieve a new balance The bottom of the spring contains two plastic nuts designed to adjust the new balance 3 When the barrier is powered on do not change the wire connection inside 4 Connect the GND to the cabinet to ensure protection Tools Preparation Make sure you have all the tools that you will need to do the...

Page 12: ...crews from the casing and the base as shown in the illustration 2 Make sure the wire slot in the centre of the base is pre opened 3 The base has a downward opening Fix the location with the expansion screw M10 x 120 after identifying it 4 Place the casing on the base and install and tighten the four screws The barrier s base is shown in the figure below ...

Page 13: ...l the handlebar head Make sure the flat key on the main shaft is aligned with the key notch on the handlebar head then gently tap the handlebar head in place Please see the figure below 2 Install the centre screw and tighten it 3 Attach the boom arm to the boom holder s head 4 Install the remaining two screws and tighten them 5 Connect the LED light s power cord ...

Page 14: ...Board External Product Requirement External product requirements for the control board are Power supply 24V 4 to 10 A Motor type 24DC Brushless motor Vehicle detector or 12V radar ground sensor Main Board Wiring Diagram Note Network cables must not be connected to any of the control board s external signal lines Although the network wires have no connectivity issues they are easily broken after nu...

Page 15: ...he main board buzzer beeps for a long time when the motor reaches its open limit The self check for the opening is now complete and the gate can be used normally 6 3 2 Operation Steps of the Main Board Buttons 1 Press and hold the main board menu button until L 1 is appearing 2 To select the menu directory press the On or Close key on the mainboard If you need to enter this directory press the Men...

Page 16: ...LB330 Parking Barrier User Manual P a g e 1 6 Copyright 2022 ZKTECO CO LTD All rights reserved Parameter Settings Description ...

Page 17: ...LB330 Parking Barrier User Manual P a g e 1 7 Copyright 2022 ZKTECO CO LTD All rights reserved ...

Page 18: ...LB330 Parking Barrier User Manual P a g e 1 8 Copyright 2022 ZKTECO CO LTD All rights reserved ...

Page 19: ...te control Any key and the main board will beep once and the display will change to L F to match the remote control successfully 3 Press the Confirm button to save and the configuration is complete 6 5 2 Delete Remote Control Pairing 1 Long press the Menu button to enter the menu select the L F option click the Menu button to display 000 and then enter the remote control setting 2 Set the paramete...

Page 20: ...tal position Adjust the parameters of the main board menu L 9 or L 6 please refer to the parameter table for menu functions 5 The barrier rod is not in the vertical or horizontal position Set the L 18 parameter of the main board to 1 if the relay will act once when it is opened or closed it means it has been opened or closed If the motor stops moving while the barrier is in position it indicates i...

Page 21: ...ected appropriately or the connection method is incorrect If smoke or a strange smell comes from the product disconnect the power immediately If the product works abnormally please contact the dealer in time Please do not try to repair it by yourself If you handle it without authorization the company is not responsible for any damage 9 Transportation and Storage While loading and unloading the pro...

Reviews:

Related manuals for LB330