background image

PB3000 User Manual 

14 

3)

 

Wiring Diagram of the Mains Supply and Motor 

 

 

4)

 

Wiring Diagram of the Extension Board and Main Control Board 

 

Summary of Contents for PB3000 Series

Page 1: ...User Manual PB3000 ...

Page 2: ...m 3m 3 Chapter 2 Product Installation 4 2 1 Installation Precautions 4 2 2 Cable Embedding 4 2 3 Cabinet Installation 4 2 4 Boom Installation 5 2 5 System Diagram 7 2 6 Wiring Diagram of the Push Button Station 8 Chapter 3 Troubleshoot 9 Chapter 4 Optional Functions 10 4 1 Loop Detector 10 4 2 Cooling System 11 Chapter 5 Device Maintenance 12 Appendix Wiring Diagram 13 ...

Page 3: ...ies are equipped with gray painted cabinets PB3030 and PB3060 include main and vice boom PB3010 has one main boom The dimensions are shown in the following figures Figure 1 1 the boom length of the PB3010 Figure 1 2 the boom length of the PB3030 Main boom Vice boom 1500mm Main boom ...

Page 4: ...ual 2 Figure 1 3 the boom length of the PB3060 1 2 Components inside the cabinet Figure 1 4 Components inside the Chassis Four expansion bolts Position sensor Air switch Motor Gearbox Handle Main boom Vice boom 3000mm ...

Page 5: ... of a control board and a position sensor 1 4 Specification Parameters of Product Series Appearance Model Boom Type Standard Boom Length Lifting Falling Speed Fastening Mode Note Gray appearance series PB3010L Straight boom 3 2 M 1 8s Cabinet on the left There are 200V and 100V types for the device PB3010R Straight boom 3 2M 1 8s Cabinet on the right PB3030L Straight boom 4 5M main boom 3 2m vice ...

Page 6: ...2 Route cables to be connected through protective sleeves 3 Use a tool to open a cable tray on the ground see figure 2 1 Figure 2 1 Cable embedding 2 3 Cabinet Installation Installation Procedure 1 Use Bolt Holes Dimensioning to mark the installation position of the cabinet as shown in Figure 2 2 2 Drive four expansion bolts into the Bolt Holes Dimensioning as shown in Figure 2 3 3 Open the access...

Page 7: ...e booms If your purchase is PB3010L R there will be only one boom If your purchase is PB3030L R or PB 3060L R there will be a main boom and a vice boom which need to be connected together 3 Putting the connection part of vice boom into the main boom then fixed by 2 screws 4 Installing the boom to the chassis Screw pad Ground Ground Base concrete Chassis Expansion bolt ...

Page 8: ...PB3000 User Manual 6 Figure 2 6 Connect the main boom with vice boom together Figure 2 7 Installing the Boom to the Chassis Fasten screws Iron piece Screw Boom Putting the vice boom into the main boom ...

Page 9: ...ing barrier and Wall The distance between the chassis and the wall should be greater than or equal to 100 mm The distance between the boom and the wall should be greater than or equal to 100 mm System Diagram A standard power wire RVV3 1 0 A signal line RVV4 0 5 Control room ...

Page 10: ...PB3000 User Manual 8 2 6 Wiring Diagram of the Push Button Station Control board ...

Page 11: ... boom shakes during falling or lifting adjust position C The shaking that occurs during lifting is caused by the overlarge spring force In this case loosen the screws If the boom shakes during falling tighten the screws See Figure 3 2 3 Use the motor handle to lift the boom in the case of a power failure See Figure 3 3 Figure 3 1 Figure 3 2 Figure 3 3 Position C Position A Position B Handle ...

Page 12: ...e parking system consist of loop loop detector and control board The loop is installed under the ground When loop detect a vehicle the boom will not fall down after the vehicle pass the boom will automatically fall down The wiring diagram is shown in the figure 4 1 Figure 4 1 Control board ...

Page 13: ...l 11 4 2 Cooling System The cooling system consists of a 12V power supply an extension board and a fan The installation of fan is shown in the 4 2 and the wiring diagram is shown in the figure 4 3 Figure 4 2 Figure 4 3 ...

Page 14: ...Device Maintenance 1 Maintain the boom Fix the reflective sticker 2 Tighten terminals connector of the device 3 Clear dust on components inside the cabinet Note that technicians should maintain the parking barrier system once a month ...

Page 15: ... button on control board until D9 red light flashes one time All the registered transmitters will be deleted after successful operation Register the transmitter Press K4 setting button until D8 yellow light flashes Hold on K4 press any button on transmitter until D9 red light flashes one time Maximum 7 different code transmitters can be registered 2 Interface of the Extension board ...

Page 16: ...PB3000 User Manual 14 3 Wiring Diagram of the Mains Supply and Motor 4 Wiring Diagram of the Extension Board and Main Control Board ...

Reviews: