Gateway
Configuration Manual
P a g e
|
11
Copyright©2020 ZKTECO CO., LTD. All rights reserved.
4. The newly added Gateway information will be displayed on the list as shown below.
5. Now select the Gateway from the list and click
Enable
, where the
Status
and the
Enable
column
will turn to the green state, which means the Gateway is
active/online
mode and will take 1 hour
to accept the ZigBee connection from locks so that you can swipe the Net-in card on the locks.