background image

SBTL7000 Series

 

 

User Manual 

P a g e

 | 14 

 

Copyright©2021 ZKTECO CO., LTD.  All rights reserved. 

8.

 

Gate Closing Compensation Speed (08EXXX) 

Running jitter or not running smoothly can be debugged with this. The larger the number is set, 
the faster of  the  compensation  speed. The Gate Closing  compensation  Speed value can be set 
between 0 to 50 and the default value is 9. 

9.

 

Host/Slave Setting(09EXXX) 

 

(09E000) Hose 

 

(09E001) Slave (default) 

10.

 

RS485 Address (10EXXX) 

Set the value can be set between 0 to 254 and the default value is 0. 

11.

 

Open duration time (11EXXX) 

Verify that no one passes after the switch is opened. After arriving at the set time, the switch will 
shut down automatically. The valid value for Automatic Closing Time can be set between 2 to 60 
seconds and the default value is 5s. 

12.

 

Gate Closing Delay Time (12EXXX)  

Set the delay time of gate closing aften passing. The valid value for Gate Closing Delay Time can be 
set between 0 to 60 seconds and the default value is 0s. 

13.

 

Correct Barrier Position Adjustment (13EXXX) 

 

(13E001) Zero position 

 

(13E002) Right position 

 

(13E003) Left position

 

 

(13E004) Slave position

 

Adjust the position only when SBTL7000 is installed properly. 

When setting the zero position, you can manually push the swing arm for fine-tuning. If the barrier 
exceeds a certain angle, it will be invalid. (At this time, the digital LED displays 13E000). 

14.

 

Gate Opening Memory (14EXXX) 

 

(14E000) Close (default) 

 

(14E001) Open 

When more than two legal access signals are given at the same time (including the same direction 
and the opposite direction), the system will remember all pass requests and complete each pass in 
turn. 

 

Summary of Contents for SBTL7000 Series

Page 1: ...carefully before operation Follow these instructions to ensure that the product is functioning properly The images shown in this manual are for illustrative purposes only For further details please vi...

Page 2: ...h the design and that the said personnel have received thorough training in operating and maintaining the machine unit equipment It is further essential for the safe operation of the machine unit equi...

Page 3: ...hine unit equipment and such amendments shall not give any right to claim any compensation or damages under any circumstances ZKTeco shall in no way be responsible I in case the machine unit equipment...

Page 4: ...t research and development of biometric verification procedures and the productization of biometric verification SDK which was initially widely applied in PC security and identity authentication field...

Page 5: ...nd field names are inside square brackets For example pop up the New User window Multi level menus are separated by forwarding slashes For example File Create Folder Symbols Convention Description Thi...

Page 6: ...1 4 SYSTEM COMPOSITION 8 1 5 TECHNICAL SPECIFICATIONS 8 1 6 2 INSTALLATION 9 INSTALLATION REQUIREMENTS 9 2 1 INSTALLATION POSITION 9 2 2 CABLES INSTALLATION AND FIXING 10 2 3 3 MENU INTRODUCTION 12 FU...

Page 7: ...user s valid access card its barriers swing automatically thus allowing users passage to the secured side Chassis Design and Dimensions 1 1 SBTL7000 series is made of cold rolled sheet cabinet with p...

Page 8: ...isplays the pedestrian passage path and directs them to pass through the lane in a safe and orderly manner Alarm The alarm gives an alarm voice if the system detects any unauthorized entry to the pass...

Page 9: ...mally open mode Normally close mode and Testing mode Normal Working Mode In this working mode the turnstile works normally Normal Open Mode In this working mode the turnstile is always open Normal Clo...

Page 10: ...on check if the connection is done correctly at the connecting points of the ground wire at the connector assemblies and wiring points of the circuits as well as at each movable part of the swing barr...

Page 11: ...0V and its master and slave are connected by an 5 core cable signal and a 2 core cable power When installing the swing barrier turnstile the user only needs to connect it to the corresponding ports No...

Page 12: ...anchor bolts or expansion bolts Place the swing barrier turnstile according to the sizes and positions as shown in the figure before installation and fixing Connect the online cables and perform the...

Page 13: ...e previous menu and discard the current operation ADD It is used for navigating the upper menu item and increasing the value DEC It is used for navigating to the lower menu item and decreasing the val...

Page 14: ...an be set between 5 to 30 and the default value is 23 4 Gate Opening Deceleration Distance 04EXXX The larger the number the longer the deceleration time and the more stable the swing arm operation The...

Page 15: ...g Time can be set between 2 to 60 seconds and the default value is 5s 12 Gate Closing Delay Time 12EXXX Set the delay time of gate closing aften passing The valid value for Gate Closing Delay Time can...

Page 16: ...uration Time 19EXXX Set the duration of stay in the channel after successful verification The valid value for Stay Duration Time can be set between 5 to 30 seconds and the default value is 10s 20 Forc...

Page 17: ...set to 25E001 only the False Direction Entry 26E000 is effective 27 Anti tailgate Setting 27EXXX Set as anti tailgate to close gate not close gate or disabled 27E000 Close 27E001 Only alarm default 27...

Page 18: ...strophe 31E001 Upright default 32 Swing Arm Type 32EXXX 32E000 Ordinary swing door default 32E001 Larger swing door Error Code 3 3 Error Code Cause ER0002 Power on Self test failure Hall limit detecti...

Page 19: ...SBTL7000 Series User Manual P a g e 18 Copyright 2021 ZKTECO CO LTD All rights reserved Wiring Diagram and Function 3 4 Check circuit according to the following wiring diagram...

Page 20: ...These buttons control the barrier to open to the left or right side 4 Access control power supply It supplies power for the access board 5 RS485 communication port It is used for receiving external si...

Page 21: ...ricant for smooth movement Power Supply Maintenance 4 3 Switch off the power supply before maintenance Check the power plug connection if found loose fix it properly Do not change any connection posit...

Page 22: ...the 5 core 2 core connection line 3 Delay in barrier opening or it doesn t close Cause It may be due to if the time of the barrier opening is set as too long Solution Check whether the time of the op...

Page 23: ...ZKTeco Industrial Park No 32 Industrial Road Tangxia Town Dongguan China Phone 86 769 82109991 Fax 86 755 89602394 www zkteco com Copyright 2021 ZKTECO CO LTD All Rights Reserved...

Reviews: