ZK-MD6000 Series
User Manual and Installation Guide
P a g e
| 13
Copyright © 2022 ZKTECO CO., LTD. All rights reserved.
6
Installation
Please follow the installation steps below after reading the installation
precautions and checking the packing list:
Step 1
: Unpack the package, and place the left and right door panels on
the ground, with the power boards of the two door panels facing outward,
as shown in the figure below.
Step 2
: Insert the wires inside the machine head into the corresponding
positions.
Left door panel internal interface identification: