Swing Gate Opener
User Manual
P a g e
| 19
Copyright©2022 ZKTECO CO., LTD. All rights reserved.
Loosen the fastening screws first, then change the open and shut limit positions separately to learn
the travel. If the gate cannot be closed in position, please move the close limit position to direction
A; If the gate is over closed, please move the close limit position to direction B; If the gate cannot be
opened in position, please move the open limit position to direction B; If the gate is over opened,
please move the open limit position to direction A.
For the first few times, you can adjust it greatly to approximately determine the open and close limit
position. And then adjust it slightly to finally decide the open and close limit position accurately.
Please remember to fasten all screws after adjustment, insert the plastic pieces to their original place
and press with the rubber block.
Warning
To ensure safety and protect the machines, please install a gate stopper at the open limit
position when the door opens outward to prevent the gate from running over its travel.
Meanwhile, to enable the 2 swings to close to their accurate limit position, please install a limit
stopper at the close limit position (as shown in figure 9). Similarly, when the door opens inward,
please install a limit stopper at the close limit position (as shown in figure 8).
Before installing the main machine, please make sure that the main machine and components
are in good mechanical performance and the door can be manually operated flexibly.
One control unit can optionally drive one main machine or two main machines.
Earth leakage circuit breaker must be installed on where the gate movement can be seen, and
the minimum mounting height for the control box should be over 1.5m to avoid being touched
by kids.
After installation, please check whether the mechanical property is good or not, whether gate
movement is flexible or not after unlocking, and whether the infrared sensor (optional) is
installed correctly and effectively.