8
W
all Hood Installation
WALL HOOD INSTALLATION
8. Install the two part chimneys on top of the hood. Slide the inside section up until
the vertical vent slots are visible, attach top portion to mounting bracket with
screws. Secure lower chimney portion to the hood with screws provided.
Figure 6
9. Install the grease cup by sliding into brackets located at the bottom of the motor.
Install baffle channel and baffle filters. Not all models include baffle channels.
Figure 7
Figure 8
Figure 6
Figure 7
1. Screw
2. Screw
3. Screw
Summary of Contents for 697-R-30
Page 38: ...31 Insert Installation INSERT INSTALLATION Installation Tutorial Video 36 30 36...
Page 52: ...45 Single Motor Electrical Diagram SINGLE MOTOR ELECTRICAL DIAGRAM CHANGING PARTS...
Page 53: ...46 Double Motor Electrical Diagram CHANGING PARTS DUAL MOTOR ELECTRICAL DIAGRAM...
Page 103: ...Installation Guide and User Manual 1 614 777 5004 1 1 0 www zlinekitchen com...