background image

Attach the transition piece

, rubber gasket

 and ducting

to top of the hood

.

5

 

Install the duct work in the center o

f

the ceiling bracket.

4

Attach the angle iron pieces to the hood.

Measure your cut chimney, add 2.5in and 

attach the second angle iron to correct height 

for mounting. 

 3

Reviews: