4
Pr
oduct Installation
INSTALLATION
STEP 1
• Place the 1/4” steel mounting plate on the wooden subfloor where you plan to
install the filler and use a pencil to mark 4 holes.
• Remove the plate and pre-drill those 4 holes using a 5/16” bit.
• Drill a 2’’ wide hole for hot and cold water lines to pass through.