20
Island Hood Installation
ISLAND HOOD INSTALLATION
1. Slide chimney pieces over the angle iron on the hood. Pull the electrical plug to
the top of the chimney sections.
Figure 4
2. Lift the hood to attach the angle iron to the ceiling bracket. Use screws provided
to attach.
3. Make your electrical and ducting connections. Use rigid ducting wherever
possible. Try and minimize the use of elbows. More elbows and longer
runs create higher static pressure. No more than two to three elbows are
recommended. The hood comes with a grounded three prong plug that can
either be direct wired or plugged into a 20 amp circuit in the ceiling. The cord is
68.5” long.
4. Slide top chimney piece up over the mounting bracket on the ceiling and secure
it in place with the provided screws.
Figure 5
5. Install stainless steel baffle filters. Before installing baffle filters, make sure that
you insert the grease cup under the motor blower.
Figure 4
Figure 5
Summary of Contents for RK62342
Page 1: ...Range Hood Installation Guide and Users Manual...
Page 7: ......
Page 12: ...4 Wall Hood Installation WALL HOOD INSTALLATION Installation Tutorial Video...
Page 18: ...10 Designer Wall Hood Installation DESIGNER WALL HOOD INSTALLATION Installation Tutorial Video...
Page 25: ...17 Island Hood Installation ISLAND HOOD INSTALLATION Installation Tutorial Video...
Page 35: ...27 Under Cabinet Installation UNDER CABINET INSTALLATION Installation Tutorial Video...
Page 38: ...30 Insert Installation INSERT INSTALLATION Installation Tutorial Video...
Page 52: ...44 Single Motor Electrical Diagram SINGLE MOTOR ELECTRICAL DIAGRAM CHANGING PARTS...
Page 53: ...45 Double Motor Electrical Diagram CHANGING PARTS DUAL MOTOR ELECTRICAL DIAGRAM...
Page 103: ......