ZMC212BE Motion Controller User Manual V1.5
weak current wiring, it is recommended to be more than 20cm.
⚫
It should be noted that the equipment grounding (chassis) on the entire line must be
good, and the grounding of the chassis should be connected to the standard factory
ground pile.
→
Cable Requirements:
Twisted pair shielded wire, and shielded cable grounded.
3.3.2.
Basic Usage Method
(1)
Please follow the above wiring instructions for correct wiring.
(2)
After power on, please use ETHERNET, RS232 or RS485 to connect to ZDevelop.
(3)
Please use the "ADDRESS" and "SETCOM" commands to set and view the protocol
station number and configuration parameters, see "ZBasic Programming Manual" for
details.
(4)
Correctly set the relevant parameters of the third-party equipment according to their
respective instructions to match the parameters of each node.
(5)
After all the settings are completed, restart the power supply of all stations to
establish communication.
(6)
RS485 communication data can be checked directly through “ZDevelop
/ Controller
/ Controller State /
CommunicationInfo”.
Summary of Contents for ZMC212BE
Page 1: ......