Page 20
Nature
2®
Fusion Soft Installation and Operation Manual
6.
Tighten strain relief
fi
tting screws for the
fl
ow/temp/salinity sensor and the DC cord.
Do not pull
fl
ow/temp/salinity sensor cable or DC cord too tight. Allow some slack cable inside of power pack enclosure.
CAUTION
Do not over-tighten the strain relief
fi
tting. Over-tightening can cause damage to the
fl
ow/temp/salinity sensor
cable.
WARNING
Do not operate the electrolytic cell without water circulation. A buildup of
fl
ammable gases will result in FIRE or
EXPLOSION.
Figure 11. Wiring Diagram for the Power Pack
Power Pack Wiring Diagram
CHLORINE GENERATOR
POWER INTERFACE
J13
J12
J11
BLK/YEL
BLK/RED
BLK/WHT
BLACK
Factory wired for 240 VAC service; Middle primary
wires connected together. If electrical service is
120 VAC, the power supply must be modified.
Flow, Salinity, Temp Sensors
RIBBON CABLE TO
USER INTERFACE
GR
Y BK R
LOW VOLTAGE RACEWAY
HIGH VOLTAGE
HEAT SINK
L - BRACKET
CHLORINE GENERATOR
USER INTERFACE
To Chlorine Generator Cell
View of chlorine generator PCB
shown with transformers and
components located behind front
face plate.
PRIMARY
SECONDARY
CHLORINE GENERATOR
TRANSFORMER
BLK/WHT
BLK/YEL
BLK/RED
BLK
Use Copper Conductors Only – Rated for 90°C Minimum
Re-wired for
120 VAC
Load 2
Load 1
Load 1 (Hot)
Ground (Chassis)
Ground (Chassis)
To Earth
Bonding Point
To Earth
Bonding Point
Load 2 (Neutral)
240
VAC
Pool Pump Timer
Circuit Breaker
Panel
Line 1
Line 2
Ground
50/60 Hz
3 wire
3
12
6
9
Filter Pump
(240 VAC)
7.
Prior to reattaching the front cover, check the wiring. Be sure the
fl
ow/temp/salinity sensor is plugged in. The
DC cord should be plugged in. Also, check the AC wiring.
8.
If the ribbon cable connecting the user interface to the power interface board was disconnected during
installation then reconnect before reattaching cover (see Figures 11, 12 and 13).