/ 9
2
ASSEMBLY PROCEDURE
We recommend that you follow the specific order of the assembly procedure. Proceed step by step
and refer to the corresponding pages.
PROCEDURE
PAGE
SECTION
1. inventory the elements composing your boat,
and learn how to recognise them
2
CHECK ON UNPACKING
I - V
DESCRIPTION
2. Install the stowage box (Model Int’L only)
3
ASSEMBLY
3. activate valves into inflating position
5
INFLATION SYSTEM
4. install the H2P floor in the boat
4
ASSEMBLY
5. Begin inflation of the boat. (not completely)
6
INFLATION
6. Inflate the H2P floor to correct pressure
6
INFLATION / PRESSURE
7. Install the seat
8
ASSEMBLY OF EQUIPMENT
8. finish inflation of the boat to the correct pressure
6- 7
INFLATION / PRESSURE
9. Install the oars
8
ASSEMBLY OF EQUIPMENT
CHECK ON UNPACKING
CAUTION
DO NOT USE A SHARP TOOL
The pack must contain: 1 buoyancy tube +
CADET
Aero
240
Aero
260
CFR
285 acti-v
CFR
325 acti-v
CFR
360 acti-v –
Int’L
Inflatable floorboard H2P
+ keel
X
X
Acti-V floorboard (built-in
keel)
X X X
Repair kit
X X X X X
Owner’s manual *
X X X X X
Standard equipment
Removable wooden seat
X X X X X
Carry bag
X X X X X
Reinforced aluminium
oar
2 2 2 2 2
Fuel tank strap
X X X X X
High pressure foot pump
X X X X X
Stowage box Int’L (with
bag)
X
* 2 volumes
You can equip your boat with many optional accessories (transportation wheels, boarding ladder,
lifting rings etc.). Ask your dealer to advise you.
Summary of Contents for CADET AERO
Page 11: ......