5
Testing the Power Path
1 . Turn off power supply .
2 . Remove 4 screws to remove cover and hang cover from venting with “S” hooks provided in kit .
Do not disconnect ribbon wire .
3 . Turn on power supply .
4 . Use multimeter set on AC volts up to at least 250 VAC to test between L & M (All results should
be +/- 10%) .
Results = 220V?
YES
NO
Unit receiving power – continue testing.
Have qualified electrician rewire chlorinator to
220V or determine
why no voltage.
Reset or replace
circuit breaker.
(see Circuit Breaker pg. 4)
Transformer receiving power
circuit breaker OK (continue testing).
6. Test between N & K = 220V?
YES
NO
7. Test between H & F and H & D.
Results should be as printed
on transformer (26.5V).
Both tests read OK?
YES
NO
Transformer is good.
Replace transformer.
(see Transformer pg. 9)
A B C D E F G H
I J N K L M
Summary of Contents for DuoClear
Page 1: ...Troubleshooting Manual ...