© Copyright 2002 Zoeller Co. All rights reserved.
4
1. Remove all inner packing from around the softener.
2. Carefully cut box corners down to allow for easy removal of unit from carton.
Care should be taken to avoid cutting into unit.
3. Draw untreated water sample into container. Open test kit and dip tester into water
sample.
4. Compare strip with chart to determine water hardness. Retain this number for
setting control valve later in the installation process.
5.
Carefully move unit into approximate installation position.
6. Loosen compression nut located on right side of control valve by turning counter
clockwise. Insert end of 3/8” O.D. tube, making sure tube is pushed in fully. Visually
check brine tubing for cracks or kinks. Tighten the compression nut.
Do not over tighten.