COMPUTER-CONTROLLED HIGH SPEED LOCKSTITCH BAR TACKING MACHINE
i
CONTENTS
I. EXPLANATION OF COMPUTER-CONTROLLED HIGH-SPEED LOCKSTITCH
BAR TACKING MACHINE
[
1
]
SPECIFICATIONS
..............................................................................................................................1
[
2
]
CONFIGURSTION
..............................................................................................................................2
1. Names of main unit................................................................................................................................2
[
3
]
INSTALLATION
..................................................................................................................................3
1. Attaching the connecting rod................................................................................................................3
2. Installing the head support rod..............................................................................................................3
3. Installation of the sewing machine head..............................................................................................4
4. Installing the drain receiver...................................................................................................................5
5. Tilting the sewing machine head............................................................................................................5
6.Connecting the operation panel..............................................................................................................6
7.Installing the eye protection cover..........................................................................................................6
8.Installing the thread stand.......................................................................................................................7
[
4
]
.OPERATION OF THE SEWING MACHINE
...........................................................................7
1. Lubrication...............................................................................................................................................7
2. Attaching the needle................................................................................................................................8
3. Threading the machine head.................................................................................................................8
4. Installing and removing the bobbin case...............................................................................................9
5. Installing the bobbin................................................................................................................................9
6. Adjusting the thread tension..................................................................................................................10
7. Adjusting the thread take-up spring....................................................................................................10
[
5
]
MAINTENANCE
.................................................................................................................................11
1.Adjusting the height of the needle bar
.......................................................................................11
2.Adjusting the needle-to-shuttle relation
....................................................................................11
3.Adjusting the lift of the work clamp foot
..................................................................................12
4.The moving knife and counter knife
...........................................................................................13
5
.Adjusting the wiper
..........................................................................................................................14
6.
Draining the waste oil
......................................................................................................................14
7.
Adjusting the amount of oil supplied to the hook
...................................................................14
8.
Replenishing the designed places with grease
..........................................................................15
9.
Adjusting the position of the shear driv
pulley
................................................................ 16
10.
Position the wire-
ing safety sensor and the wire-
cam
........................ 16
[
6
]Table of the standard patterns and standard clamp foot
...............................................18
[
7
]Table of the optional parts
...........................................................................................................20
II.EXPLANATION OF COMPUTER-CONTROLLED HIGH-SPEED LOCKSTITCH
BUTTON SEWING MACHINE
[
1
]
SPECIFICATIONS
............................................................................................................................21