ZONEMASTER MAXIPOINT V2 DAMPER CONTROL SYSTEM
- Installation Manual
6
5) Pre-Installation
Good planning leads to a successful zone system installation. Before
physical installation and commissioning a zoning system, please complete
the following listed tasks:
5.1 Decide how many zones (dampers) are to be controlled in the system.
5.2 Assign lower order zones (1, 2, 3…) to dampers close to return air
grille which will automatically open when spilling required. However
avoid using lower order zones for bedrooms as this may cause
discomfort if auto spilling occurs during sleep time.
5.3 Group zones according to customer’s requirements. Each group
initially has one zone but can have up to a maximum of 4 zones
(Example: There could be 1 or more zones going into a common area
such as Kitchen/ Dining or Family/ Dining room). Work out the total
group number (Maximum total group number in a system is 16).
5.4 Decide which group will have the Turbo function. Record the above
mentioned information to table 1 and 2 on page 8 in the Operation
manual and to the table on the sticker of the Main Control Module.
NOTE: It is important to test all cables before installation.
Testing all cables to be used before the start of the installation will
save considerable diagnostic time if the fully installed system is
subsequently found to have a problem. Cable testing is quick and
easy with a Zonemaster Cable tester available from Polyaire
Cable Tester
(Item Number: 657089)