1
、
FRAME COMPONENT
9
CHK
ADJ
NO.
PART NO.
PART NAME
QTY
CAUTION
1
1251100-061093 M6×22 Screw bolt
2
2
1274200-033000 ZT310
-
R No.2 holder of front disc oil pipe
1
3
1184200-004000 ZT310 Horn
1
4
1274100-017000 ZT250
-
S Cable clip
2
5
1224100-037000 0 level antiflaming binding
(
black 3.6×295
)
2
6
1274100-095000 ZT250
-
S Holder of flameout switch cable
1
7
1184100-012000 ZT250
-
S Flameout switch
1
8
1250205-040095 GB70.1M8×16 Screw
2
9
1251112-001093 M6×16 Hexagon flange bolts (color zinc)
1
10
1274200-183000 ZT310-V outlet pipe bracket
1
11
1184200-174000 ZT310 rectifier (five wire)
1
12
1274200-141000 ZT310-V high voltage package bracket
1
13
1251100-101000 Non-standard bolt M6×12
(
304 stainless steel
)
1
14
1184200-177000 ZT310 EFI ignition coil
1
15
1250201-032093 GB818M5×16 bolt
2
16
1050954-017000 LDK8RTIP
-
0.8 sparking plug
1
Fig.2 FRAME&ELECTRONIC
PARTS COMPONENT
Electronic parts COMPONENT-2
PROCEDURE:
●
Horn
Take off the plug of horn take the horn
⑶
by one hand, using 8# plum wrench rotate the screw
⑴
by another
hand remove the holder
⑵
then take off the horn.
●
Flameout switch
Find and take off the plug of the flameout swich
⑹
press and take off the cable clip
⑷
cut ribbon
⑸
.Using
the 6# inner hexagon tool, remove the bolts
⑻、
the holder
⑹
and the flameout switch
⑺
.
●
Rectifier
Find and remove the rectifier plug, Using 8# sleeve remove the bolt
⑴
, remove the outlet pipe bracket
⑽;
Using 8#sleeve remove the bolt
⑼
and remove the rectifier
⑾
.
●
Ignition coil
P
ull out the metal shield cap of the ignition coil
⒂
from the spark plug
⒃
on the engine, Then remove the bolt
⒁
with a Phillips screwdriver to remove the coil
⒂
.Using 4# inner hexagon socket remove the bolt
⒀
and
remove the high pressure package bracket
⑿
.
CAUTION
:
●
Do not pull the cable hard when removing the sub-mud switch.