ZXUPS S60

ZXUPS S606/S610 

6/S610 (V1.1) Installation 

(V1.1) Installation  Manual

Manual

  

10

10

Confidential and Proprietary Information o

Confidential and Proprietary Information of ZTE CORPORATION

f ZTE CORPORATION

Grounding Requirements

Grounding Requirements

As  shown  in

As  shown  in

Figure  2

Figure  2

,  the  grounding  cable  of  the  UPS  should  be

,  the  grounding  cable  of  the  UPS  should  be

connected  between  the  input/  output  connector  bar  and  the

connected  between  the  input/  output  connector  bar  and  the

grounding  busbar  in  the  equipment  room.  The  resistance  between

grounding  busbar  in  the  equipment  room.  The  resistance  between

the equipment and the ground should be less than or equal to 5

the equipment and the ground should be less than or equal to 5

.

.

Unpacking for Inspection

Unpacking for Inspection

 

 

 

 

Unpack  the  package  box  after  the  equipment  is  taken  to

Unpack  the  package  box  after  the  equipment  is  taken  to

installation  site.  During  unpacking,

installation  site.  During  unpacking,

take  care  to  avoid  any

take  care  to  avoid  any

scratch to the coating of the equipment

scratch to the coating of the equipment

.

.

 

 

After unpacking, check the template at the rear of the UPS cabinet

After unpacking, check the template at the rear of the UPS cabinet

to make sure that the delivered equipment is the

to make sure that the delivered equipment is the

same one that

same one that

was ordered

was ordered

.

.

 

 

Check  whether  the  equipment  parts  are  consistent  with  those  on

Check  whether  the  equipment  parts  are  consistent  with  those  on

the packing list.

the packing list.

 

 

Please  contact  the  local  office  of  ZTE  CORPORATION  or  its  local

Please  contact  the  local  office  of  ZTE  CORPORATION  or  its  local

personnel  if  the  equipment  is  damaged  during  transportation  or

personnel  if  the  equipment  is  damaged  during  transportation  or

missing; meanwhile, keep the equipment properly.

missing; meanwhile, keep the equipment properly.

Summary of Contents for S610

Page 1: ...N ZTE Plaza Keji Road South ZTE Plaza Keji Road South Hi Tech Industrial Park Hi Tech Industrial Park Nanshan District Shenzhen Nanshan District Shenzhen P R China P R China 518057 518057 Tel Tel 86 86 755 755 26771900 26771900 800 9830 9830 800 9830 9830 Fax 86 755 26772236 Fax 86 755 26772236 URL URL http support zte com cn http support zte com cn E mail E mail doc zte com cn doc zte com cn ...

Page 2: ...y fitness for a particular purpose title or non warranty of merchantability fitness for a particular purpose title or non infringement ZTE CORPORATION and its licensors shall not be liable for damages infringement ZTE CORPORATION and its licensors shall not be liable for damages resulting from the use of or reliance on the resulting from the use of or reliance on the information contained herein i...

Page 3: ...er better services to our customers our customers Please fill out the following questionnaire and fax Please fill out the following questionnaire and fax to to 86 755 26772236 86 755 26772236 Or mail to Or mail to Publications R D Department ZTE CORPORATION ZTE Plaza A Wing Keji Publications R D Department ZTE CORPORATION ZTE Plaza A Wing Keji Road South Hi Tech Industrial Park Shenzhen P R China ...

Page 4: ...e brief concise brief Improve Improve the the Contents Contents Add m Add more step ore step by step pr by step procedures ocedures Improve Improve the the organization organization Add Add more troubles more troubleshooting information hooting information Include Include more more figures figures Make Make it less it less technical technical Add Add more more examples examples Add more b Add more...

Page 5: ...ctions tions 1 1 Chapter 2 Chapter 2 5 5 Installati Installation on Preparati Preparations ons 5 5 Flow Flow Desc Descript ription ion 5 5 Installation Site Inspection Installation Site Inspection 7 7 Working Environment Requirements Working Environment Requirements 7 7 Power Supply Requirements Power Supply Requirements 8 8 Other Requirements Other Requirements 8 8 Lightnin Lightning and Surge Pr...

Page 6: ... Serial Hot Backup Mode 33 33 Mainte Maintenance bypas nance bypass descriptio s description n 3 37 7 Require Requirements for Binding Cables ments for Binding Cables 3 39 9 Electri Electrical Connecti cal Connection check on check 4 40 0 Cha Chapt pter 5 er 5 43 43 System Commissioning System Commissioning 43 43 Commissioning Flow Commissioning Flow 4 43 3 Startin Starting the g the UPS UPS 4 44 ...

Page 7: ...ppendix A 55 55 Backgroun Background Mo d Monitoring nitoring 55 55 Rel Relay Ou ay Outpu tput Mod t Mode e 56 56 RS232 Seri RS232 Serial Port Mode al Port Mode 57 57 SNMP Ne SNMP Networ tworkin king Mode g Mode 58 58 Fi Figu gure res s 61 61 Tab Tables les 63 63 ...

Page 8: ...This page is intentionally blank This page is intentionally blank ...

Page 9: ...ical This manual details the functions and features technical specifications the operation instructions and alarm codes of the specifications the operation instructions and alarm codes of the monitoring unit and routine operation maintenance of the UPS monitoring unit and routine operation maintenance of the UPS in addition it introduces the operating principles of the UPS and in addition it intro...

Page 10: ...ety precautions precautions Chapter 2 Installation Preparations Chapter 2 Installation Preparations Describes the requirements before installing Describes the requirements before installing the equipment the equipment Chapter Chapter 3 3 Equipment Equipment Installation Installation Describes Describes the the UPS UPS installation installation Chapter Chapter 4 4 Electrical Electrical Connections ...

Page 11: ...rop down lists dialog box names window names CAPS CAPS Keys Keys on on the the keyboard keyboard and and buttons buttons on on screens screens and and company company name name C Co n o ns t s t a n a nt t w wi i d dt t h h Text that you type program code files and directory names and Text that you type program code files and directory names and function names function names Optional Optional para...

Page 12: ...ath or serious injury avoided could result in death or serious injury Caution Indicates a potentially hazardous situation which if not Caution Indicates a potentially hazardous situation which if not avoided could result in minor or moderate injury It may also be avoided could result in minor or moderate injury It may also be used to alert against unsafe practices used to alert against unsafe prac...

Page 13: ...r support center at 86 755 26771900 and 86 800 9830 9830 and 86 800 9830 9830 Documentation Support Documentation Support ZTE welcomes your comments and suggestions on the quality and ZTE welcomes your comments and suggestions on the quality and usefulness of this document For further questions comments or usefulness of this document For further questions comments or suggestions on the documentati...

Page 14: ... Installation V1 1 Installation Manual Manual vi vi Confidential and Proprietary Information o Confidential and Proprietary Information of ZTE CORPORATION f ZTE CORPORATION This page is intentionally blank This page is intentionally blank ...

Page 15: ...h voltages Only This equipment involves high temperature and high voltages Only qualified professionals can install operate and troubleshoot the qualified professionals can install operate and troubleshoot the equipment The installation operation and maintenance of this equipment The installation operation and maintenance of this equipment must comply with local safety specifications and related e...

Page 16: ...S will have charge on it So wait for the release of charge for more than 10 minutes it So wait for the release of charge for more than 10 minutes before dismantling the cabinets before dismantling the cabinets It is recommended to check the power input of UPS and the It is recommended to check the power input of UPS and the internal parts that might be contacted with a voltmeter before internal pa...

Page 17: ...on requirements Caution Caution Safety precautions for battery Safety precautions for battery Use the batteries of the same model otherwise Use the batteries of the same model otherwise battery will be damaged battery will be damaged Improper operations of battery will cause danger Avoid Improper operations of battery will cause danger Avoid short circuit and overflow of electrolyte in operation T...

Page 18: ...RPORATION conditioner blower starter electric drill motor and fluorescent lamp to conditioner blower starter electric drill motor and fluorescent lamp to avoid UPS damage avoid UPS damage Caution Caution Keep good ventilation Keep good ventilation Maintain good ventilation by keeping the UPS ventilation Maintain good ventilation by keeping the UPS ventilation hole and fan clean hole and fan clean ...

Page 19: ...pter describes preparation requirements for installing the This chapter describes preparation requirements for installing the UPS equipment UPS equipment Flow Description Flow Description The installation flow is shown in The installation flow is shown in Figure 1 Figure 1 Note Note Only qualified personnel have the authority to install and Only qualified personnel have the authority to install an...

Page 20: ...N F FL L O O W W Start Start Unpack for Unpack for inspection inspection Check the Check the installati installation on site site Install battery Install battery cabinet cabinet Connect cables Connect cables Debug the system Debug the system Perform final Perform final acceptance test acceptance test Preliminary Preliminary acceptance acceptance Fail Fail Pass Pass Pass Pass Fail Fail Install the ...

Page 21: ...refore the battery working temperature should range from 0 C to 40 C It is battery working temperature should range from 0 C to 40 C It is then recommended to install air conditioner in the equipment room then recommended to install air conditioner in the equipment room Table 4 Table 4 lists the requirements for the working environment lists the requirements for the working environment T TA A B B ...

Page 22: ...input terminal the When diesel generator is configured at the AC input terminal the apparent input power of the UPS should be less than 30 of the apparent input power of the UPS should be less than 30 of the generator capacity generator capacity AC input switch should be configured outside the UPS air switch AC input switch should be configured outside the UPS air switch with proper capacity shoul...

Page 23: ...uld be as short as possible The requirements for grounding the should be as short as possible The requirements for grounding the arrester cable are similar to the requirements for grounding other arrester cable are similar to the requirements for grounding other cables cables Figure 2 Figure 2 shows the lightning protection measures for the AC input shows the lightning protection measures for the ...

Page 24: ...aken to Unpack the package box after the equipment is taken to installation site During unpacking installation site During unpacking take care to avoid any take care to avoid any scratch to the coating of the equipment scratch to the coating of the equipment After unpacking check the template at the rear of the UPS cabinet After unpacking check the template at the rear of the UPS cabinet to make s...

Page 25: ...n Select proper installation mode Select proper installation mode Install the UPS on the floor when the floor of the equipment room Install the UPS on the floor when the floor of the equipment room is not antistatic is not antistatic Install the UPS on a framework or base when the floor of the Install the UPS on a framework or base when the floor of the equipment room is antistatic equipment room ...

Page 26: ...3 shows the shows the UPS installation flow on UPS installation flow on the floor the floor F FI G U R E I G U R E 3 3 F FL O W O F L O W O F I IN S T A L L I N G N S T A L L I N G U UP PS S O O N N F FL O O R L O O R Start Start Select the Select the installati installation on position position Determine the hole Determine the hole position position for expansion bolts for expansion bolts Drill h...

Page 27: ...n and convenient for convenient for cabling with good ventilation and convenient for operation and maintenance operation and maintenance F FI G U R E I G U R E 4 4 U UP PS S I IN S T A L L A T I O N N S T A L L A T I O N P PO S I T I O N O S I T I O N Front side Front side UPS UPS cabinet cabinet L1 L1 0 5 m 0 5 m L2 L2 0 1 m 0 1 m L3 L3 0 3 m 0 3 m L1 the space in front of the UPS cabinet L1 the ...

Page 28: ... E I G U R E 5 5 A A P P E A R A N C E O F T H E P P E A R A N C E O F T H E A A N C H O R N C H O R P PL A T E L A T E 3 3 Determine the position of holes to Determine the position of holes to fix the expansion bolts fix the expansion bolts i i Place the UPS cabinet in the installation position Place the UPS cabinet in the installation position ii ii Place the anchor plate as shown in Place the a...

Page 29: ...viation depth is 70 mm During drilling prevent any deviation caused by the vibration of the drill Make sure that the holes caused by the vibration of the drill Make sure that the holes are vertical to the floor are vertical to the floor ii ii Fix expansion bolts Fix expansion bolts Put flat washer spring washer and nut onto the expansion Put flat washer spring washer and nut onto the expansion bol...

Page 30: ...tallation position through the rollers at the bottom at the bottom ii ii Put down the four feet with a wrench to take the rollers Put down the four feet with a wrench to take the rollers away Adjust the feet to stabilize and level the UPS The away Adjust the feet to stabilize and level the UPS The vertical gradient of the side of cabinet to the floor should be vertical gradient of the side of cabi...

Page 31: ...ix the UPS after confirming that the stated operations are confirming that the stated operations are reliably completed reliably completed Make sure that the UPS is stabilized and leveled If the vertical Make sure that the UPS is stabilized and leveled If the vertical gradient is higher than 5 adjust the feet again until it is less gradient is higher than 5 adjust the feet again until it is less t...

Page 32: ...the framework should be the same with or similar The dimensions of the framework should be the same with or similar to that of the UPS cabinet The dimensions of the top layer and the to that of the UPS cabinet The dimensions of the top layer and the bottom layer are the same the height of the framework is the same bottom layer are the same the height of the framework is the same with that of the a...

Page 33: ... E W O R K R A M E W O R K Start Start Select the installation Select the installation position position Determine the hole position Determine the hole position of expansion bolts of expansion bolts Drill holes and install Drill holes and install expansion bolts expansion bolts Place the UPS cabinet Place the UPS cabinet Screw down expansion Screw down expansion bolts bolts Yes Yes No No Qualified...

Page 34: ...l holes on the floor according to the holes of the bottom layer Then fix the framework with expansion bolts Then fix the framework with expansion bolts 3 3 Place the UPS Place the UPS i i Push the UPS cabinet close to the framework Push the UPS cabinet close to the framework ii ii Put down the four feet with a wrench to take the rollers Put down the four feet with a wrench to take the rollers away...

Page 35: ... Passed Passed or or Not Not 1 1 The four feet of the UPS cabinet are on the ground The four feet of the UPS cabinet are on the ground while the rollers are off the ground while the rollers are off the ground Yes Yes No No 2 2 The UPS cabinet is stabilized and leveled with the The UPS cabinet is stabilized and leveled with the vertical gradient less than 5 vertical gradient less than 5 Yes Yes No ...

Page 36: ...condition For example wrap metal part with insulation condition For example wrap metal part with insulating tape to avoid short circuit and human injury insulating tape to avoid short circuit and human injury 2 2 Battery cable Battery cable i i The battery cable must comply with the related requirement The battery cable must comply with the related requirement to avoid damage of batteries to avoid...

Page 37: ...from fire and and any equipment any equipment that that can cause spark to prevent the batteries from being can cause spark to prevent the batteries from being damaged or exploded damaged or exploded 5 5 Battery connection Battery connection i i Check whether the battery is inversely connected Check whether the battery is inversely connected ii ii Never reverse positive and negative polarities and...

Page 38: ... Installation V1 1 Installation Manual Manual 24 24 Confidential and Proprietary Information of ZTE CORPORATION Confidential and Proprietary Information of ZTE CORPORATION This page is intentionally blank This page is intentionally blank ...

Page 39: ...le serves to transmit high voltage before any related operation make sure that the mains supply has been related operation make sure that the mains supply has been cut off Label the switches that are forbidden from cut off Label the switches that are forbidden from operations operations iii iii Make sure that the input cables of mains supply are Make sure that the input cables of mains supply are ...

Page 40: ...at neutral cable live cable live wire and wire and earth wire earth wire of the of the UPS UPS are reliably connected to avoid short circuit To ensure operation are reliably connected to avoid short circuit To ensure operation safety connect the grounding cable of UPS first and make that it safety connect the grounding cable of UPS first and make that it is connected reliably is connected reliably...

Page 41: ...e cross If the cabling distance is less than 30 m calculate the cross sectional area of cables with the cost effective current density of sectional area of cables with the cost effective current density of 3 A mm 3 A mm2 2 5 A mm 5 A mm2 2 Refer to the recommendations in Refer to the recommendations in Table 7 Table 7 The cross sectional area of grounding wire should be higher than The cross secti...

Page 42: ...he to learn about the locations of the connection box the definition of the connecting locations of the connection box the definition of the connecting terminals and the location of the socket for outer battery terminals and the location of the socket for outer battery Danger Danger Before connection turn off OFF the external power Before connection turn off OFF the external power supply of the UP...

Page 43: ...late terminals cover plate Battery input terminals Battery input terminals cover plate cover plate 2 2 Strip off the insulating layer at cable terminal and connect Strip off the insulating layer at cable terminal and connect the inside copper wire to connecting terminal it is not the inside copper wire to connecting terminal it is not recommended to tin the cable terminals recommended to tin the c...

Page 44: ...M I N A L Connection in Single UPS Mode Connection in Single UPS Mode Danger Danger Before delivery there is one short circuit cable between Before delivery there is one short circuit cable between the live bypass BYPASS L terminal and the auxiliary the live bypass BYPASS L terminal and the auxiliary bypass bypass AUX termin AUX terminal Please al Please do not do not remove t remove the cable he ...

Page 45: ...ector bar Connector bar Bind cables after connection Refer to Section Requirements for Bind cables after connection Refer to Section Requirements for Binding Cables in this chapter for details Binding Cables in this chapter for details Caution Caution To ensure operation safety first connect the grounding To ensure operation safety first connect the grounding cable and make sure that cable and mak...

Page 46: ...e input neutral cable therefore the input neutral cable should be input neutral cable therefore the input neutral cable should be connected to the UPS directly connected to the UPS directly Connect the input live cable between the Connect the input live cable between the L L terminal on terminal on AC IN AC IN of of the UPS and the AC distribution cabinet connect the input the UPS and the AC distr...

Page 47: ...ode Connection in Serial Hot Backup Mode In serial hot backup mode an uninterruptible power supply system In serial hot backup mode an uninterruptible power supply system consists of two UPS one is master UPS and the other is slave UPS consists of two UPS one is master UPS and the other is slave UPS Figure 16 Figure 16 shows how to connect cables in serial hot backup mode shows how to connect cabl...

Page 48: ... 2 0 0 V V A A C C 2 2 4 4 0 0 V V D D C C B B A A T T T T E E R R Y Y I I N N P P U U T T L L N N B B a a t t t t e e r r y y p p a a c c k k 2 2 2 2 4 4 0 0 V V D D C C A A C C i i n n p p u u t t d d i i s s t t r r i i b b u u t t i i o o n n c c a a b b i i n n e e t t S S l l a a v v e e U U P P S S M M a a s s t t e e r r U U P P S S a a n n d d S S l l a a v v e e U U P P S S s s h h o o u...

Page 49: ...ect cables in serial hot To connect cables in serial hot backup mode backup mode 1 1 Remove the short circuit cable of the master UPS Remove the short circuit cable of the master UPS Before delivery the short circuit cable is connected between the Before delivery the short circuit cable is connected between the BYPASS L BYPASS L bypass live terminal and the bypass live terminal and the AUX AUX byp...

Page 50: ...C input distribution cabinet Connect the input neutral cable 1 between the Connect the input neutral cable 1 between the N N terminal on terminal on AC IN AC IN of the master UPS and the AC input distribution of the master UPS and the AC input distribution cabinet cabinet ii ii Connect Connect the the AC AC input input cable cable for for the the slave slave UPS UPS Connect the input live cable 1 ...

Page 51: ...t the positive battery cable to the terminal on BATTERY INPUT BATTERY INPUT of the master UPS of the master UPS Connect the negative battery cable to the terminal on Connect the negative battery cable to the terminal on BATTERY INPUT BATTERY INPUT of the master UPS of the master UPS ii ii Connect battery cables to the slave UPS Connect battery cables to the slave UPS Connect the positive battery c...

Page 52: ...19 for for maintenance bypass maintenance bypass when when the the ZXDP04 U101 power distribution unit is not used ZXDP04 U101 power distribution unit is not used F FI G U R E I G U R E 1 18 8 M MA A I I N N T T E E N N A A N N C C E E B B Y Y P P A A S S S S I I N N S SI N G L E I N G L E M MO O D D E E F FI G U R E I G U R E 1 19 9 M MA A I I N N T T E E N N A A N N C C E E B B Y Y P P A A S S S...

Page 53: ... the bottom in the cable bundle Try to avoid interleaving of cables as shown in to avoid interleaving of cables as shown in Figure 20 Figure 20 F FI G U R E I G U R E 2 20 0 R RE Q U IR E M E N T S F O R E Q U IR E M E N T S F O R C CA A B B L L I I N N G G Si Side v de vie iew w Fr Fro ont vi nt view ew S Si id de e v vi ie ew w F Fr ro on nt t v vi ie ew w Wiring Wiring area area Cable ties Cabl...

Page 54: ...igure 23 F FI G U R E I G U R E 2 23 3 R RE Q U IR E M E N T F O R E Q U IR E M E N T F O R C CA A B B L L E E T TI I E E E EN N D D Electrical Connection check Electrical Connection check Check each item listed in Check each item listed in Table 8 Table 8 The electrical connection is not The electrical connection is not acceptable unless the check result of every item is acceptable unless the che...

Page 55: ...d connected Yes Yes No No 7 7 The cable between the The cable between the L L terminal on terminal on BYPASS BYPASS and and the the AUX AUX terminal is firmly connected for the terminal is firmly connected for the master UPS in serial hot backup mode the cable master UPS in serial hot backup mode the cable should be removed should be removed Yes Yes No No 8 8 In serial hot backup mode the live wir...

Page 56: ... Installation V1 1 Installation Manual Manual 42 42 Confidential and Proprietary Information o Confidential and Proprietary Information of ZTE CORPORATION f ZTE CORPORATION This page is intentionally blank This page is intentionally blank ...

Page 57: ...ystem commissioning This chapter describes how to perform system commissioning Commissioning Flow Commissioning Flow System commissioning flow is shown in System commissioning flow is shown in Figure 24 Figure 24 In serial hot In serial hot backup mode first perform commissioning for the slave UPS then backup mode first perform commissioning for the slave UPS then perform commissioning for the mas...

Page 58: ... R E 2 24 4 S SY S T E M Y S T E M C CO M M I S S I O N I N G O M M I S S I O N I N G F FL L O O W W Parameters Parameters setting setting Start up UPS Start up UPS End End Start Start Battery Battery charging charging Load Load connection connection Starting the UPS Starting the UPS Flow Description Flow Description Figure 25 Figure 25 shows how to start the UPS for the first time shows how to st...

Page 59: ... ZTE CORPORATION 45 45 F FI G U R E I G U R E 2 25 5 F FL O W O F L O W O F S ST A R T I N G T A R T I N G U UP PS S F O R T H E F O R T H E F FI R S T I R S T T TI I M M E E Power on Power on Check before Check before power on power on Turn on Turn on Successful Successful No No Set parameters Set parameters Power off Power off Turn off Turn off Yes Yes Start Start ...

Page 60: ...ric drill motor and fluorescent blower starter electric drill motor and fluorescent lamp lamp Yes Yes No No 3 3 The The load load connected connected to to the the UPS UPS should should be be no no more more than the rated capacity of the UPS to avoid the than the rated capacity of the UPS to avoid the UPS from over load protection or working in UPS from over load protection or working in bypass m...

Page 61: ... IN T E R F A C E N T E R F A C E Turn on UPS Turn on UPS 1 1 Y Ye es s 2 2 N No o ii ii Press the Press the button on the panel to move the cursor to button on the panel to move the cursor to 1 1 Yes Yes and press and press Enter Enter Note Note If If 2 2 No No is selected or no choice is is selected or no choice is made within one minute made within one minute the UPS will automatically turn off...

Page 62: ...n in BATTERY MODE interface as shown in Figure 29 Figure 29 F FI G U R E I G U R E 2 28 8 L L IN E IN E M MO D E O D E I IN T E R F A C E N T E R F A C E LINE MODE LINE MODE 15 20 15 20 220V 50 0Hz 220V 50 0Hz F FI G U R E I G U R E 2 29 9 B B A A T T T T E E R R Y Y M MO D E O D E I IN T E R F A C E N T E R F A C E BATTERY MODE BATTERY MODE 15 20 15 20 220V 50 0Hz 220V 50 0Hz Note Note If the UPS...

Page 63: ...switch switch on on the the panel panel When When the the backlight backlight of of the LCD is completely off it indicates that the UPS has been shut the LCD is completely off it indicates that the UPS has been shut down down 2 2 Power off the UPS Power off the UPS i i Turn OFF the AC INPUT switch at the rear of the UPS if the Turn OFF the AC INPUT switch at the rear of the UPS if the switch is sw...

Page 64: ...o Set the parameters of the master UPS according to Table 10 Table 10 T TA A B B L L E E 1 10 0 P PA A R R A A M M E E T T E E R R C CO N F I G U R A T I O N F O R O N F I G U R A T I O N F O R S SI N G L E I N G L E U UP PS S M MO O D D E E It Item em De Defa faul ult t Co Conf nfig igur urat atio ion n Ma Mand ndat ator ory y 1 Output F 1 Output F 50 50 Hz Hz 50 Hz 50 Hz 60 60 Hz Hz Yes Yes 2 Ou...

Page 65: ...4 Run Mode 4 Run Mode Master Master Slave Slave Master Master Yes Yes 2 New password 2 New password 0000 0000 After After changing changing the the password password do keep the new one do keep the new one in mind in mind No No 7 Neutral Alarm 7 Neutral Alarm Enable Enable 1 1 Enable Enable 2 2 Disable No Disable No Caution Caution The output frequency should be consistent with the local The outpu...

Page 66: ... be consistent with those of the master UPS should be consistent with those of the master UPS 3 3 After parameters setting restart the UPS to After parameters setting restart the UPS to make the settings take effect make the settings take effect Charging Battery Charging Battery During storage process the capacity of battery reduces gradually During storage process the capacity of battery reduces ...

Page 67: ...r UPS when it is required to supply power of the master UPS when it is required to supply power Caution Caution In case of mains failure before the battery has been In case of mains failure before the battery has been charged enough the system will switch to battery mode but charged enough the system will switch to battery mode but the backup time of the battery will be less than the the backup ti...

Page 68: ... Installation V1 1 Installation Manual Manual 54 54 Confidential and Proprietary Information o Confidential and Proprietary Information of ZTE CORPORATION f ZTE CORPORATION This page is intentionally blank This page is intentionally blank ...

Page 69: ...e the RS232 serial port is connected to the serial In this mode the RS232 serial port is connected to the serial port of the background computer and the ZTE background port of the background computer and the ZTE background power supply monitor software installed in the computer is used power supply monitor software installed in the computer is used to locally monitor the UPS to locally monitor the...

Page 70: ...Input Input mains mains supply supply fault fault status status signal signal 3 3 DRY 3 DRY 3 Bypass Bypass status status signal signal 4 4 DRY COM DRY COM Common Common end end 5 5 DRY 5 DRY 5 Battery Battery backup backup status status signal signal 6 6 RE CON RE CON Input Input end end of of remote remote shutdown shutdown 7 7 XGND XGND Power Power ground ground of of interface interface board ...

Page 71: ...or 28 VDC the maximum current of the relay contact is 28 VDC the maximum current of the relay contact is 1 A 1 A The relay and the control circuit are The relay and the control circuit are insulated insulated RS232 Serial Port Mode RS232 Serial Port Mode The UPS has a 9 pin RS232 serial port The pin definition is shown in The UPS has a 9 pin RS232 serial port The pin definition is shown in is show...

Page 72: ...an be monitored using this mode F FI G U R E I G U R E 3 31 1 C CO N N E C T IO N IN O N N E C T IO N IN RS232 RS232 S SE R I A L E R I A L P PO R T O R T M MO D E O D E W I T H W I T H ZXUPS ZXUPS S610 S610 T TA A K K E E N N A A S S A A N N E EX A M P L E X A M P L E PC PC SNMP Networking Mode SNMP Networking Mode In this mode the SNMP card should be configured in the UPS system In this mode the...

Page 73: ...dicate indicate whether whether the the adaptor adaptor is is inserted inserted There is a short circuit between the pin 8 and the There is a short circuit between the pin 8 and the pin 10 when the adaptor is inserted pin 10 when the adaptor is inserted 9 9 XGND XGND Power Power ground ground for for SNMP SNMP board board 10 10 XGND XGND Power Power ground ground for for SNMP SNMP board board 11 1...

Page 74: ... Installation V1 1 Installation Manual Manual 60 60 Confidential and Proprietary Information o Confidential and Proprietary Information of ZTE CORPORATION f ZTE CORPORATION This page is intentionally blank This page is intentionally blank ...

Page 75: ...gle UPS Mode PS Mode 31 31 Figure 16 Electrical Connect Figure 16 Electrical Connection in Serial Hot Backup Mode ion in Serial Hot Backup Mode 34 34 Figure 17 Conn Figure 17 Connect of Bypass In ect of Bypass Input Wires put Wires 37 37 Figure 18 Maintenance bypass in Single Mode Figure 18 Maintenance bypass in Single Mode 38 38 Figure 19 Ma Figure 19 Maintenance b intenance bypass in Dual H ypas...

Page 76: ... Installation V1 1 Installation Manual Manual 62 62 Confidential and Proprietary Information o Confidential and Proprietary Information of ZTE CORPORATION f ZTE CORPORATION This page is intentionally blank This page is intentionally blank ...

Page 77: ...ection nd Cross Section Area of Cables Area of Cables 27 27 Table Table 8 Elec 8 Electrical trical Connection Connection Check Check Items Items 40 40 Table 9 Table 9 Inspection Inspection Items Befor Items Before First e First Power on Power on 46 46 Table 10 Parame Table 10 Parameter Configuration for Sing ter Configuration for Single UPS Mode le UPS Mode 50 50 Table Table 11 Par 11 Parameters a...