Grounding Requirements
Grounding Requirements
As shown in
As shown in
Figure 2
Figure 2
, the grounding cable of the UPS should be
, the grounding cable of the UPS should be
connected between the input/ output connector bar and the
connected between the input/ output connector bar and the
grounding busbar in the equipment room. The resistance between
grounding busbar in the equipment room. The resistance between
the equipment and the ground should be less than or equal to 5
the equipment and the ground should be less than or equal to 5
Ω
Ω
.
.
Unpacking for Inspection
Unpacking for Inspection
Unpack the package box after the equipment is taken to
Unpack the package box after the equipment is taken to
installation site. During unpacking,
installation site. During unpacking,
take care to avoid any
take care to avoid any
scratch to the coating of the equipment
scratch to the coating of the equipment
.
.
After unpacking, check the template at the rear of the UPS cabinet
After unpacking, check the template at the rear of the UPS cabinet
to make sure that the delivered equipment is the
to make sure that the delivered equipment is the
same one that
same one that
was ordered
was ordered
.
.
Check whether the equipment parts are consistent with those on
Check whether the equipment parts are consistent with those on
the packing list.
the packing list.
Please contact the local office of ZTE CORPORATION or its local
Please contact the local office of ZTE CORPORATION or its local
personnel if the equipment is damaged during transportation or
personnel if the equipment is damaged during transportation or
missing; meanwhile, keep the equipment properly.
missing; meanwhile, keep the equipment properly.