UPS Installation on Framework
UPS Installation on Framework
Drill holes on the floor of the equipment room to fix the framework,
Drill holes on the floor of the equipment room to fix the framework,
which should be prepared by the user, and install the UPS cabinet on
which should be prepared by the user, and install the UPS cabinet on
the framework.
the framework.
The dimensions of the framework should be the same with or similar
The dimensions of the framework should be the same with or similar
to that of the UPS cabinet. The dimensions of the top layer and the
to that of the UPS cabinet. The dimensions of the top layer and the
bottom layer are the same; the height of the framework is the same
bottom layer are the same; the height of the framework is the same
with that of the antistatic floor. Prepare the framework according to
with that of the antistatic floor. Prepare the framework according to
Figure 10
Figure 10
.
.
F
F
I G U R E
I G U R E
1
1
0
0
D
D
I M E N S I O N S O F T H E
I M E N S I O N S O F T H E
F
F
R A M E W O R K
R A M E W O R K
Figure 11
Figure 11
shows the flow for installing the UPS on the framework.