- System Commissioning
- System Commissioning
Confidential and Proprietary Information o
Confidential and Proprietary Information of ZTE CORPORATION
f ZTE CORPORATION
53
53
Connecting the Load
Connecting the Load
After the battery is charged enough, turn on the AC OUTPUT switch
After the battery is charged enough, turn on the AC OUTPUT switch
of the master UPS when it is required to supply power.
of the master UPS when it is required to supply power.
Caution:
Caution:
In case of mains failure before the battery has been
In case of mains failure before the battery has been
charged enough, the system will switch to battery mode but
charged enough, the system will switch to battery mode but
the backup time of the battery will be less than the
the backup time of the battery will be less than the
standard time and the load will not
standard time and the load will not
be reliably supplied.
be reliably supplied.