ZTE WP560/960
User Manual
5.1.3 Connection between outdoor antenna and FWP
Operation guide
After the outdoor antenna is well installed, please connect the feeder line to
the outdoor antenna, tie it to a backstop and then place it down. After going
through a lightening arrester, connect the feeder line to your FWP, screw it tight
and make sure the connection is reliable. At the same time do not try to hang
heavy things on the cable line or drag/distort the cable. The feeder cable we
provide is about 15 meters long, don’t try to add power cable to lengthen it. If the
length is not enough, please contact us.
5.1.4 Lightening arrest measures
Because the outdoor antenna is normally installed at higher outdoor places,
you should consider lightning protection. We will provide you with detailed
lightening protection suggestions, please choose and buy the lightening rod and
arrester as suggested. Our company shall not be responsible if any accident
happens because of misoperations by users without following the instructions
(without installing lightening conductor as suggested) .
10
Summary of Contents for WP560
Page 1: ......
Page 2: ......
Page 71: ......
Page 89: ...ZTE WP560 960 用户手册 3 电池安装后示意 4 装上电池盖 话机手柄安装 连接无线固话和电脑 无线固话挂墙安装 14 ...
Page 133: ......