The installation of the antenna feeder equipment is important to the installation of the
BTSB equipment. Its construction quality is directly related to the operating
performance of the entire BTSB system. Moreover, most of the BTSB installation
engineering is the installation of the antenna feeder equipment that generally takes up
80% of the installation time of the whole BTSB system. The installation of the antenna
feeder equipment involves the installation of the antenna, the jumper, the routing of the
main feeder, and the installation of the lightning protection system and the GPS.
Different antenna may be used, and the installation method and procedure also vary
with the terrain, population density and installation environment. With the quality
guaranteed, the installation supervisor should have the antenna installed flexibly and
reasonably as required in specific situations by following the BTSB engineering design
documents and the installation instructions of the special antenna provided by the
manufacturer.
Prior to the installation of the antenna feeder system, inspect the qualification of the
installation staff to work at heights, check and prepare the installation environment, the
installation measures, the installation tools and the antenna feeder to be installed so that
the installation can be carried out successfully.
10.1.1 Preparation by Installation Personnel
The engineering of the antenna feeder is generally conducted by the antenna feeder
installation personnel under the supervision of the installation supervisor.
The installation supervisor should be familiar with the materials, tools and operation
methods for the antenna engineering, organize and coordinate the installation persons
for proper work with the spirit of top safety, especially in the operations on tower. The
engineering supervisor fills the engineering data with sincere attitude.
Requirements for the installation staff: Staff that can conduct the installation
professionally under the instruction of the supervisor. The staff working at heights
should have no acrophobia and be in good health. In addition, he should have the
qualification and certificate for working at heights, observe the requirements for using
the safety tools and have purchased life insurance policy. Besides, alcohol drinking is
prohibited.
10.1.2 Checking the Installation Environment
During the environment inspection, you should focus on the following: Whether the
Summary of Contents for ZXC10 BTSB I1
Page 4: ......
Page 16: ......
Page 22: ... ii Table C 2 1 BTSB Board Indicators C 2 ...
Page 76: ......
Page 91: ...Chapter 7 Cable Installation in Cabinet 7 15 Fig 7 3 5 RF Cable Interface in RFS ...
Page 96: ......
Page 106: ......
Page 114: ......
Page 157: ...Chapter 12 Board Installation 12 11 Fig 12 5 1 Positions of Boards ...
Page 158: ......
Page 174: ......
Page 180: ......