Chapter 13 Hardware Installation Check
13-15
3. Fill in a corresponding vswr value and provide vswr test-chart.
13.17 Checking Indoor & Outdoor Environments
Requirements:
1. Clean outdoor engineering waste. After the installation is over, the outdoor work
site should be recovered to what it was, without any cable strap, stub, waste
paper box, waste cable or waste plastic bag. The whole site should be clean and
tidy.
2. Put away indoor unused materials. The materials to be put in the equipment
room should be kept in order. Keep everything indoor clean and tidy. No
littering is allowed.
3. Remove any cable strap, stub, desiccant and other engineering materials under
the raised floors at the rack bottom and around the rack.
4. Clean the front door, rear door and side plate of the rack, leaving no visible
stains caused by hand touching. There should be no dirt inside and outside the
rack (dead angle) and inside the cabinet, there should be no cable clip or
sundries left.
5. Clean the fingerprint or other stains on the cabinet surface.
13.18 Base Station Information Table
Record the model and the sequence number of all parts installed for the required base
station information table.
Summary of Contents for ZXC10 BTSB I1
Page 4: ......
Page 16: ......
Page 22: ... ii Table C 2 1 BTSB Board Indicators C 2 ...
Page 76: ......
Page 91: ...Chapter 7 Cable Installation in Cabinet 7 15 Fig 7 3 5 RF Cable Interface in RFS ...
Page 96: ......
Page 106: ......
Page 114: ......
Page 157: ...Chapter 12 Board Installation 12 11 Fig 12 5 1 Positions of Boards ...
Page 158: ......
Page 174: ......
Page 180: ......