1-1
1 Installation Overview
Summary:
z
Hardware installation flow of the BTSB system
z
Precautions for BTSB installation
1.1 BTSB Installation Overview
The cabinet of ZXC10 BTSB I1 comprises three basic chassis: RF chassis (RFS),
baseband chassis (BDS) and power chassis (PWS). These chassis can be combined in
different ways in a cabinet, as shown in Fig. 1.1-1. The appearance of the BTSB macro
base station of ZTE is shown in Fig. 1.1-2.
The BTSB system installation involves the following parts:
1. The BTSB cabinet, including the cabinet, internal cables and boards.
2. The power system, which provides -48V operating power for the system.
3. The grounding system, which provides protection ground for the parts of the
BTSB.
4. The antenna system, including the antenna, jumpers and feeders (a test of the
antenna & feeder system is necessary).
5. The GPS system, including the GPS and the feeder.
6. The trunk cable, that is, connecting the cables with the connectors.
7. The monitoring system, including the temperature, humidity and other
environment sensors.
BTSB system installation is shown in Fig. 1.1-3.
Summary of Contents for ZXC10 BTSB I1
Page 4: ......
Page 16: ......
Page 22: ... ii Table C 2 1 BTSB Board Indicators C 2 ...
Page 76: ......
Page 91: ...Chapter 7 Cable Installation in Cabinet 7 15 Fig 7 3 5 RF Cable Interface in RFS ...
Page 96: ......
Page 106: ......
Page 114: ......
Page 157: ...Chapter 12 Board Installation 12 11 Fig 12 5 1 Positions of Boards ...
Page 158: ......
Page 174: ......
Page 180: ......