2-1
2 Installation Preparations
Summary:
z
Environment check prior to the BTSB installation
z
Tool and instrument preparation prior to the BTSB installation
z
Technical documentation preparation prior to the BTSB installation
2.1 Checking the Installation Environment
Check the following environment items before installation:
Before installation, the customer should prepare the equipment room, power supply
and grounding cables, and provide necessary facilities for the project implementation.
The area and height of the equipment room should satisfy the requirements of the
equipment layout. Otherwise, reconstructions are required to eliminate the problems
faced during the installation, operation and maintenance of the equipment.
The BTSB should not be used in the environment with high temperature, thick dust,
harmful gases, explosive articles or low air pressure. It shall be put far from
transformer stations and traction substations, and shall not be in places with frequent
shaking or great noises.
As the equipment of BTSB cannot be moved easily, the equipment room construction
should be under a long-term plan.
The BTSB equipment room should comply with fire prevention regulations.
2.1.1 Checking the Equipment Room
The items for the equipment room inspection include:
1. The civil engineering of the equipment room and corridor has been completed,
and the wall is fully dry.
2. The height and width of the doors in the equipment room should not cause any
inconvenience for transporting the equipment. Usually, the height of the main
Summary of Contents for ZXC10 BTSB I1
Page 4: ......
Page 16: ......
Page 22: ... ii Table C 2 1 BTSB Board Indicators C 2 ...
Page 76: ......
Page 91: ...Chapter 7 Cable Installation in Cabinet 7 15 Fig 7 3 5 RF Cable Interface in RFS ...
Page 96: ......
Page 106: ......
Page 114: ......
Page 157: ...Chapter 12 Board Installation 12 11 Fig 12 5 1 Positions of Boards ...
Page 158: ......
Page 174: ......
Page 180: ......