Chapter 2 Installation Preparations
2-9
Category Name
Auxiliary tools
Pulley block
Rope
Ladder
Forklift
Table 2.2-2 Instruments
Instrument Name
Manufacturer
Spectrum analyzer (needed in some
special cases)
HP
Base station tester
SITE MASTER
Testing MS
Qualcomm
Compass
Multimeter
Field strength tester (needed in some
special cases)
2.3 Preparing Technical Documentation
The technical documents to be prepared before the commissioning of the equipment
include:
1. Project Survey Report, BTSB System Project Design and Engineering Drawing,
and Environment Acceptance Report.
Project Survey Report should be completed by the engineering staff sent by the
equipment supplier during the onsite survey. If engineering staff cannot conduct
the survey in time, he should entrust the equipment user to fill in the report and
mail it back after the survey for the preparation of engineering materials.
BTSB System Project Design and Engineering Drawing should be completed by
the design party entrusted by the equipment user, and its copy should be
provided by the equipment user to the equipment supplier before equipment
delivery.
Environment Acceptance Report is used for the first engineering environment
inspection during the project survey. If the environment is found to fail the
inspection, the equipment user is requested to make improvement and solve the
problem. The second environment inspection is conducted before the
engineering starts.
Summary of Contents for ZXC10 BTSB I1
Page 4: ......
Page 16: ......
Page 22: ... ii Table C 2 1 BTSB Board Indicators C 2 ...
Page 76: ......
Page 91: ...Chapter 7 Cable Installation in Cabinet 7 15 Fig 7 3 5 RF Cable Interface in RFS ...
Page 96: ......
Page 106: ......
Page 114: ......
Page 157: ...Chapter 12 Board Installation 12 11 Fig 12 5 1 Positions of Boards ...
Page 158: ......
Page 174: ......
Page 180: ......