ZXC10 BTSB (V1.0) cdma2000 Base Transceiver Station Installation Manual
3-4
Fig. 3.3-1 Packing Box of Modules
3.3.2 Unpacking Procedure
Take the following steps to unpack a carton:
1. Use the diagonal pliers to cut the straps.
2. Use a paper knife to cut the adhesive tape along the slits on the box covers. Note
that the cut shall not be too deep and damage the goods inside.
3. Count the quantity and types of boards inside the carton against the packing list
attached and sign for the acceptance with the customer on site.
3.3.3 Checking the Boards
Check the boards against the delivery list and contact the equipment supplier in time if
any incompliance is found.
3.4 Goods Acceptance and Handover
After the unpacking acceptance, both parties sign on the Unpacking Acceptance Report.
after which the goods shall be handed over to the customer if they are to be kept by the
customer after acceptance according to the contract terms. Each party shall hold a copy
of the Unpacking Inspection Report and the Project Supervisor shall feedback the
Acceptance Conclusion of the Report to be archived by the equipment supplier.
Summary of Contents for ZXC10 BTSB I1
Page 4: ......
Page 16: ......
Page 22: ... ii Table C 2 1 BTSB Board Indicators C 2 ...
Page 76: ......
Page 91: ...Chapter 7 Cable Installation in Cabinet 7 15 Fig 7 3 5 RF Cable Interface in RFS ...
Page 96: ......
Page 106: ......
Page 114: ......
Page 157: ...Chapter 12 Board Installation 12 11 Fig 12 5 1 Positions of Boards ...
Page 158: ......
Page 174: ......
Page 180: ......