ZXC10 BTSB (V1.0) cdma2000 Base Transceiver Station Installation Manual
4-14
1
2
4
3
5
6
7
1. Pressure plate 2. M10 × 25 bolts 3 Washer 4. Insulation pad 5. Cabinet support 6. Retaining nut 7. Base
Fig. 4.2-13 Fixation of Supports, Pressure Plate and Base
4.2.3.5 Testing Insulation
Connect the cabinet to the floor. The test is passed if electricity cannot be conducted
through the connection.
4.2.4 Cabinet Stacking Mode
BDS and PWS are put on RFS.
4.2.4.1 Installing the BDS Unit
On the front cover, screw five M5 bolts inside RFS through the holes on the top of
cabinet to the nut inside the BDS unit. On the back cover, fix the BDS unit to the RFS
cabinet by screwing nine screws with the edge iron, as shown in Fig. 4.2-14.
Summary of Contents for ZXC10 BTSB I1
Page 4: ......
Page 16: ......
Page 22: ... ii Table C 2 1 BTSB Board Indicators C 2 ...
Page 76: ......
Page 91: ...Chapter 7 Cable Installation in Cabinet 7 15 Fig 7 3 5 RF Cable Interface in RFS ...
Page 96: ......
Page 106: ......
Page 114: ......
Page 157: ...Chapter 12 Board Installation 12 11 Fig 12 5 1 Positions of Boards ...
Page 158: ......
Page 174: ......
Page 180: ......