Chapter 4 Cabinet Installation
4-15
1. BDS unit 2. Jointing edge iron 3. RFS unit
Fig. 4.2-14 Installation of BDS Unit
4.2.4.2 Installing the PWS Unit
The PWS units are stacked on the BDS unit. Similarly, screw five M5 screws on the
front cover and fix the two units together with ten screws and flat connection plate, as
shown in Fig. 4.2-15.
Summary of Contents for ZXC10 BTSB I1
Page 4: ......
Page 16: ......
Page 22: ... ii Table C 2 1 BTSB Board Indicators C 2 ...
Page 76: ......
Page 91: ...Chapter 7 Cable Installation in Cabinet 7 15 Fig 7 3 5 RF Cable Interface in RFS ...
Page 96: ......
Page 106: ......
Page 114: ......
Page 157: ...Chapter 12 Board Installation 12 11 Fig 12 5 1 Positions of Boards ...
Page 158: ......
Page 174: ......
Page 180: ......