Pulley block
Feeder head
bandage
Label
T ie the pull-up rope
0.4m and 3.4m away
from the feeder
Pull the feeder away from
the iron tower with this
rope to avoid damage to
the feeder or feeder head
Pull-up rope
Fig. 10.4-12 Hoisting the Feeder to the Tower
10.4.7.5
Cabling and Fixing the Main Feeders
1. Cabling principle of the main feeder
●
The main feeder that enters the equipment room from the feeder window and is
routed along the indoor cabling rack should be bound neatly without crossing.
●
The main feeder that is routed along the indoor cabling rack and the cabling rack
on the tower should have no crossing;
●
Make yourself familiar with the routing of the main feeder before cabling it. It is
better to take down its actual route on paper to avoid rework due to crossing the
cable;