Chapter
13
Installing the Integrated
Micro-BTS
13-13
M10
×
30
内六角螺栓(
4
个)
弹簧垫
(
4
个)
平垫
(
8
个)
M8
膨胀螺丝(
4
个)
M8
螺母
(
4
个)
地
G
ro
und
Spring cushion
Plain cushion
M10x30 inner hexagon bolt
M8 nut
M8 expansion screw
(4pcs)
(8pcs)
(4pcs)
(4pcs)
(4pcs)
Fig. 13.3-3 Frontal and Lateral Faces of the UPS’s Floor-type Installation
13.3.4
Installing the Engineering Cables of L010UPS
13.3.4.1
From-to-list
Table 13.3-1 shows the connections of the CDMA micro-BTS 485 / dry contact
supplementary cables.
Table 13.3-1 From-to-list of the CDMA Micro-BTS 485/dry contact supplementary cables
No. Cable
Name Length
(mm)
To End A
To End B
1 Monitoring
cable
800
BDM
-
RS485 MTPB1
-
X2
2 Monitoring
cable
800
BDM
-
JOINT MTPB1
-
X1
3 Monitoring
cable
470
MTPB1
-
X3
MONITOR at the
cabinet bottom
4 Monitoring
grounding cable
170
MTPB1
Grounding hole at the
right side of the cabinet
5
Monitoring cable
3000
MONITOR at the
cabinet bottom
DB9 socket of UPS
13.3.4.2 Layout of Cabling
Fig. 13.3-4 shows the layout of the monitoring cables of the CDMA micro-BTS
485/dry contact: