Chapter 4 - System Functions
Confidential and Proprietary Information of ZTE CORPORATION 65
9. BS power control procedure: With this procedure, the BSS controls the
transmitting power of the activated channel in the TRX.
10. Connection failure procedure: With this procedure, the BTS gives the
BSC an indication that an activated dedicated channel has been
disconnected.
11.
Physical environment content request/acknowledgement procedure:
With this procedure, the BSC obtains the physical parameters of a
specified channel, which usually occurs before a channel change is
decided. This procedure is optional.
12. SACCH fill-in information change procedure: With this procedure, the
BSC instructs the BTS to change the fill-in information (system
message) on a specific SACCH.
Channel Establishment
1. Channel activation
The procedure of activating a channel successfully is shown in Figure
42.
F
I G U R E
4 2
C
H A N N E L
A
C T I V A T E D
S
U C C E S S F U L L Y
MS
LAPD
FURRM
HPIMa
LAPD
BSC
OAMM
(CHAN ACTIV)
MPH_RRCmdToC
HP (CHP CHAN
ACTIV)
(CHAN ACTIV ACK)
DL_DATA_REQ (CHAN ACTIV ACK)
MPH_CHPIndToRR
(CHP CHAN ACTIV
RESPONSE (ACK)
DL_DATA_IND (CHAN ACTIV)
Dm_PH_CONN_IND
(if chan activated)
MS
A channel activation failure is shown in Figure 43.
Summary of Contents for ZXG10-BTS
Page 4: ...This page is intentionally blank ...
Page 8: ...Figures 121 Tables 123 ...
Page 9: ...This page is intentionally blank ...
Page 10: ......