Chapter 2 Installation of Cluster in 1+4 Mode
2.
Through the 10GE optical interfaces of the CESU, interconnect the two thick lines as
shown in
Figure 2-4
, so as to realize high speed data switching and load sharing.
3.
Stick labels on both sides of the fiber to describe the information about the fiber.
4.
Use cable straps to organize and bind the fibers in compliance with related
specifications.
Figure 2-4 ZXR10 T8000 Control Plane Cascade Connections of Cluster 1+4
2.2.3 Installing Cascade Clock Cables
The connections of the cascade clock cables among multiple devices in the ZXR10 T8000
cluster 1+4 system are as shown in
Figure 2-5
.
2-5
SJ-20110901170352-005|2011-10-15 (R2.0)
ZTE Proprietary and Confidential