ZXR10 T8000 Hardware Installation Guide (Cluster)
Figure 3-2 ZXR10 T8000 Control Plane Cascade Connections of Cluster 2+8
3.2.3 Installing Cascade Clock Cables
The cascade clock cables in the ZXR10 T8000 cluster 2+8 system are normal cables. It
is required that the clock interfaces of all the main control board (MPUs) on a line card
3-4
SJ-20110901170352-005|2011-10-15 (R2.0)
ZTE Proprietary and Confidential