Chapter 6 Hardware Installation
Figure 6-18 Fixing the ZXSDR BS8802 C100
– End of Steps –
6.4 Cable Installation
After installing the ZXSDR BS8802 C100 chassis, connect the cables. The cables to be
connected are as follows:
l
Ethernet cable
l
Power cable
l
GPS cable
6.5 GPS Antenna Feeder System Installation
6.5.1 GPS Antenna Installation
6.5.1.1 Installing a GPS Antenna in Vertical Placement
Prerequisites
The following tools must be ready.
l
Adjustable spanner
l
Normal Spanner
6-19
SJ-20110329145303-001|2011–10–25 (R1.1)
ZTE Proprietary and Confidential