0 Introduction
Fuse holder
Vacuum pump connector
Power connector
Power supply for vacuum pump
USB
Power switch
After the furnace is switched on for the first time
and the firing brick is inserted, run the setup pro-
gram. You are prompted to set the following para-
meters
Main menu
⇒
Setup Oven
⇒
First setup program
1. Setting idle temperature
2. Setting night temperature
3. Setting language
4. Setting date and time
5. Setting the unit (° C or ° F)
6. Display functions
7. Activate preview mode: "Yes" or "No"
8. After that the furnace will automatically run a dry-
ing program to remove any residual humidity that
might be in the oven after transport or storage
(cycle time approx. 20min).
9. Subsequently, a vacuum test is performed during
which the pump draws vacuum for 2 minutes. After
which a leakage test starts (for another 2 minutes)
to check the seals of the firing chamber.
10. Finally, there appears the prompt "Set Vacuum
level." Confirm with "Yes" use the dialer or the plus-
/minus buttons to enter your individual vacuum
level. Always deduct 20mm from the value reached
(e.g: value reached 760mm - 20mm = 740mm indi-
vidual vacuum value).
0.4 Initial oven setup
Start of operation:
■
Have the firing tray ready
Electrical connection:
■
The ceramic furnace requires 120V/60Hz.
1. Do not use any other power cable or extensi-
on cables
2. Use fused circuit protection before the oven
(e.g. multiway connector at the desk)
■
The power switch should be in position "0".
■
Connect the furnace to a grounded power outlet
using the supplied power cord.
■
Switch on the furnace.
■
After a brief self test, the lift will automatically
lower to its maximum open position.
Please immediately insert the firing tray.