34
2.1. WATER INTAKE AND OUTLET CONNECTIONS
WATER INTAKE
If you have an intake of potable water near the machine, you can connect it directly, for
which you need a threaded adaptor G 3/4”-14.
With the machine, proceed as follows:
Remove the higher plug of the two at the back of the machine and fix the solenoid valve to
the interior with the two threaded metal screws provided. Disconnect the transparent tube
from the submersible pump and connect it to the solenoid valve directly. Secure it in place
with the clamp provided (Fig. 16).
Disconnect the connector to the water pump, which is behind the juicing machine, and
connect the solenoid valve in the gap left (see Fig. 17 for positions and poles). The polarity
is irrelevant for the solenoid valve but not for the water pump (see diagram 24.4).
Fit the water intake tube between the intake and the machine with their respective unions.
ZUMMO INNOVACIONES MECÁNICAS S.A. does not supply the water intake tube.
Check that it is operating correctly. Press SW3 on the electronic control panel and water
should come out of the nozzle.
DRAINAGE
The machine has an outlet for installing a drainage hose which is 10 cm beneath the water
intake.
ZUMMO INNOVACIONES MECÁNICAS S.A. does not supply the drainage hose.
2.2. CONNECTING THE COIN BOX
The machine is ready for EXECUTIVE or MDB coin boxes to be fitted:
IMPORTANT: TO CONNECT OR DISCONNECT THE COIN BOX, ALWAYS SWITCH OFF
THE MACHINE! (diagram 24.1, no. 4).
-
EXECUTIVE
: Connect the coin box to the little strap supplied with the machine, and
connect this to the
J10
connector in the control panel (diagram 24.2, J10) and Fig. 9. In the
control panel, programme the Currency scanner type field to the Executive position. Once
this process has been completed, you should switch off the machine and then turn it on
again.
-
MDB
: Connect the coin box to the little strap supplied with the machine, and connect this to
the
J11
connector in the control panel (diagram 24.2, J11) and Fig. 10. In the control panel,
programme the Currency scanner type field to the MDB position. Once this process has
been completed, you should switch off the machine and then turn it on again.
- Adjust the position of the press button
(Fig. 11) so that when the door of the payment zone
is closed and the change return button is pressed, the upper lever of the coin box will be
activated (Fig. 12).
Summary of Contents for ZV25
Page 1: ......
Page 135: ...135 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ...
Page 136: ...136 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 ...
Page 137: ...137 4 31 32 33 34 35 36 37 38 39 40 41 42 ...
Page 138: ...138 ...
Page 139: ...139 ...
Page 140: ...140 ...
Page 141: ...141 ...
Page 142: ...142 ...
Page 143: ...143 ...
Page 144: ...144 ...
Page 145: ...145 ...
Page 146: ...146 ...
Page 147: ...147 ...
Page 148: ...148 ...
Page 149: ...149 ...
Page 150: ...150 ...
Page 151: ...151 ...
Page 152: ...152 ...
Page 153: ...153 ...
Page 154: ...154 ...