6 Cleaning and maintenance
6.1
General
– This chapter describes (in tabular form) all the maintenance jobs which are re
-
quired for the machine.
– The maintenance list only affects the basic unit. Maintenance activities for mo
-
dules, tool inserts and options can be found in the respective operating manual.
– Maintenance jobs that operators can carry out themselves are specially indicated
and are described in more detail in this chapter.
Important !
In general, no special tools are required for maintenance jobs that operators can car
-
ry out themselves.
– All other jobs must be undertaken only by personnel authorised by Zünd or by
Zünd Systemtechnik Customer Services or by contractual partners authorised by
Zünd Systemtechnik.
Important !
Do not exceed the specified maintenance and cleaning intervals. You can shorten
these intervals if necessary at your own discretion.
Carry out the maintenance jobs conscientiously at the specified intervals. The inter
-
vals are given in calendar periods or operating hours.
Maintenance recommendation
The manufacturer recommends that a general inspection of the machine is carried
once per year. This interval can be reduced in the case of greater utilisation and load
to the system.
Regular maintenance extends the lifetime of the cutter. Provide the service techni
-
cian with the accessories case and ensure that the maintenance work is confirmed.
Shutting down/extended downtimes
If the machine is to be shut down for a prolonged period or decommissioned, please
contact your customer service representative to arrange proper conservation of the
machine or to put the machine back into operation.
Work instructions
•
When working on the machine you must observe the safety measures described
in the "Safety" chapter.
•
Absolute cleanliness must be maintained at all times.
•
Replace damaged parts immediately with new original spare parts.
Tool heads, tools and options
Maintenance intervals/instructions on maintenance and cleaning for modules and
options can be found in the corresponding operating manual.
Summary of Contents for L-1200
Page 6: ...PN series frame version 0 4 110002 001 11 2009 jmu 0 ...
Page 14: ...Introduction PN series frame version Publishing details 1 8 110003 001 11 2009 jmu 1 ...
Page 48: ...Safety PN series frame version Disposal 3 26 110005 001 11 2009 jmu 3 ...
Page 123: ...PN series frame version Tools 7 1 100011 003 11 2009 jmu 7 7 Tools ...
Page 124: ...Tools PN series frame version 7 2 100011 003 11 2009 jmu 7 ...
Page 125: ...PN series frame version Tool heads 8 1 110008 001 11 2009 jmu 8 8 Tool heads ...
Page 126: ...Tool heads PN series frame version 8 2 110008 001 11 2009 jmu 8 ...
Page 127: ...PN series frame version Options 9 1 100015 001 11 2009 jmu 9 9 Options ...
Page 128: ...Options PN series frame version 9 2 100015 001 11 2009 jmu 9 ...
Page 129: ...PN series frame version Material feed 10 1 100012 003 11 2009 jmu 10 10 Material feed ...
Page 130: ...Material feed PN series frame version 10 2 100012 003 11 2009 jmu 10 ...
Page 132: ...Additional specifications PN series frame version 11 2 100014 003 11 2009 jmu 11 ...
Page 133: ...PN series frame version Documents 12 1 100017 001 11 2009 jmu 12 12 Documents ...
Page 134: ...Documents PN series frame version 12 2 100017 001 11 2009 jmu 12 ...
Page 142: ...Annex PN series frame version Service and maintenance works 13 8 100013 003 11 2009 jmu 13 ...