9
Unfold the two
Main Frames
(#A) and attach the two
Adjustable Round Bases
(#E) in the way shown below. Important: You
should
keep the Round Bases as close to the ground
as possible at all times, especially when you’re installing the equipment on
carpet or grass.
STEP 1
STEP 2
Connect the two
Base Tubes
(#D) with the unfolded frames. In this step, you need to use the
Allen Wrench
(#H) to tighten the
four
M6*14mm Screws
(#G).
D
G
G
G
D
G
A
E